论文部分内容阅读
An 111m long geo-engineered slope, southern cut slope (called southern wall) of a depressed power house at 412 MW Rampur Hydroelectric Project in the state of Himachal Pradesh, completely failed for its entire length on 2nd February 2010 along with a 6m high cantilever retaining wall founded on rock at the top of the cut slope.