最大时间步长对SiC/Al复合材料浸渗模拟的影响

来源 :稀有金属材料与工程 | 被引量 : 0次 | 上传用户:zrbgo
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
采用ProCAST软件模拟了SiC/Al复合材料的气压浸渗制备工艺过程,研究了模拟参数“最大时间步长(DTMAX)”对计算精度和计算效率的影响。结果表明,最大时间步长显著改变凝固过程的固相率,从而引起缩松缩孔和残余应力计算结果的明显差异;本研究所用63vol%Si C/Al复合材料浸渗过程且降温过程耗时在2 h以上的工艺模拟,最大时间步长参数优选为5 s,以兼顾计算精度和模拟效率。 ProCAST software was used to simulate the infiltration process of SiC / Al composites. The influence of simulation parameters “maximum time step (DTMAX) ” on computational accuracy and computational efficiency was studied. The results show that the maximum time step significantly changes the solid fraction of the solidification process, which leads to significant differences between the results of shrinkage shrinkage cavity and residual stress calculation. The 63vol% Si C / Al composite infiltration process and the cooling process are time-consuming In the process simulation above 2 h, the maximum time step parameter is preferably 5 s, in order to balance the calculation accuracy and simulation efficiency.
其他文献
本研究使用胶体碳球为硬模板,合成制备得到La_2Zr_2O_7壳层结构材料。通过X-ray衍射仪、红外光谱仪、扫描电子显微镜(SEM)、透射电子显微镜(TEM)等分析技术对材料的物相结构
会议
去秋今春两期的课本大部份在开学后才供应,有些书有的学校开学后两三个月才收到,严重影响了教学工作。课本不能及时供应的重要原因之一,是在运输方面中转不及时、积压严重。
加强和规范企业内部控制,对提高企业经营管理水平和风险防范能力、促进企业可持续发展、维护社会市场经济秩序和社会公众利益具有重大的意义。 To strengthen and standardi
期刊
  采用流延成型的方法制备了具一定强度和塑性的碳化硼流延素坯,讨论了分散剂、粘结剂、增塑剂和球磨时间对浆料粘度和流延膜质量的影响,从而优化了碳化硼的流延成型工艺.
現將九月二十二日湖南省人民委員會第七次會議通過的‘關於一九五五年洞庭湖堤垸整修工程的决定’隨令頒發,希即遵照辦理。省长程潛一九五五年九月二十三日 Now that the De
全國解放以來,中藥材生產有限大的發展,总產量逐年增加,基本上满足了广大人民的需要。但是,最近以來,在工农業生產大躍进当中,有些地区在抓粮食、棉花、油料等主要农作物生
武山縣的广大農民,正以愚公移山的勁头兴修水利和开展水土保持工作。这个工作在全縣已經出現高潮,農村的主要劳动力都为超額完成十万亩水地、四百平方公里的水土保持任务而