The Interlaminar Shear Failure Characteristics of Asphalt Pavement Coupled Heating Cables

来源 :2017年世界交通运输大会 | 被引量 : 0次 | 上传用户:wj0987654321
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
  Nowadays,heating cables are used as heat sources for heating pavements in practical engineering.However,there is a contradiction between the snow melting function and the interlaminar stability of heating pavement.
其他文献
The macroscopic experiments and microscopic experiments were conducted to describe stress-strain curves of low-density polymer foams and high-density polymer foams.
采用简单性能试验仪器对2 种级配以及2 种沥青胶结料的混合料试件进行动态模量试验,研究不同温度和加载频率对沥青混合料的黏弹性影响。通过拟合得到的混合料动态模量主曲线,分析了胶粉的掺加对沥青混合料的黏弹特性的影响。
为研究自愈补偿对再生沥青疲劳性能的影响,通过动态剪切试验对比分析9 种再生沥青在考虑自愈补偿前后的疲劳性能。采用初始动态模量降低50%所受的荷载作用次数评价再生沥青疲劳性能,采用疲劳寿命变化率评价再生沥青的自愈合性能。
The famous “24-zigs” mountain road was known as a “China-Anti-Japanese War Lifeline” collaborated with Burma Road,Sichuan-Guizhou Road,Ledo Road and “The Hump” during the Second World War.It made an i
In order to research the microscopic variations of weathered phyllite fillers in the bearing plate experiment,the spheroids of intergranular interaction model and the particle flow theory of discrete
编号为G2512 的阜新至锦州高速公路(以下称阜锦高速公路)于2002 年建成通车,为双向四车道高速公路。本文结合2017 年阜锦高速公路维修工程,对原路面铣刨后的半刚性基层顶面,采用了基层注浆方式对基层内部强度不足位置进行了处置,并利用FWD、LWD和3D-RADAR 等检测方法,分析了注浆处置前后路面弯沉、半刚性基层介电常数等参数的变化规律,进而分析评价了注浆处置措施的应用效果。
The preparation process of modification before emulsification was adopted.The SBS content in SBS modified asphalt was determined by test results The effects of different influencing factors such as th
本文通过k 地基上连续体薄板振动方程求解出板块振动的固有频率表达式,进而分析板块宽度、厚度、回弹模量,以及地基反应模量对固有频率的影响。
Localized ground subsidence is extremely detrimental to buried pipelines in terms of excessive bending moments and shearing stresses induced by differential soil displacements.Previous studies show th
为了评价直投式SBS 改性剂对沥青混合料性能的改善效果,对直投式SBS 改性沥青混合料进行了高温稳定性试验、浸水马歇尔试验、冻融劈裂试验以及低温抗裂性试验,并与普通SBS 改性沥青混合料的路用性能进行了对比分析。