金水河水库位于莱芜市钢城区东南部,水库建成后将对当地农业灌溉供水及城市用水提供有力保障。本文对金水河水库施工中遇到的导流问题进行论述,在充分考虑现场地形条件、主体工程布置特点和施工总进度安排等各种因素的条件下,综合确定施工导流方案。该方案不但节省工程投资,还为确保工程正常施工提供了极大的便利条件。
Jinshuihe Reservoir is located in the southeastern part of Gangcheng District in Laiwu City. Upon completion of the reservoir, it will provide strong protection to local agricultural irrigation and urban water supply. In this paper, the diversion problems encountered in the construction of Jinshuihe Reservoir are discussed. Considering all the factors such as the topographic conditions of the site, the layout characteristics of the main project and the total schedule of the construction, the construction diversion plan is determined synthetically. The program not only saves on project investment, but also provides great convenience for ensuring the normal construction of the project.