Water Surface Profiles in a Tunnel Bend with High Velocity

来源 :35th IAHR World Congress(第三十五届国际水利学大会) | 被引量 : 0次 | 上传用户:luluxxx
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
It is widely believed that a bend in horizontal plane is not suitable for a free-surface tunnel.It is also a strict rule in Specification for Design of Hydraulic Tunnel (SL279-2002) that a horizontal curve should not be adopted in the free-surface tunnel with high velocity.
其他文献
A well designed sand trap has a slow and uniform flow that enable sedimentation.The geometry and surface of an unlined sand trap excavated by rock-blasting is unstructured and rough, hence complex flo
The use of micro-or mini-models to solve some types of hydraulic problems is a subject that it is not entirely settled.It seems that for some type of problems these models can provide useful, economic
Four serial large dams at upper Brantas River was built, those are Sengguruh, Karangkates, Wlingi and Lodoyo.As multipurpose dams, indeed having important role to control flood discharges, irrigation,
The potential impacts of two different modes of operation of a tidal barrage (i.e.ebb-only and flood-ebb operating modes) on the eutrophication potential of the Severn Estuary were assessed in this st
We focus on the short-term optimization of large-scale hydropower systems with a mixture of storage reservoirs and run-of-the-river projects.
The further development of renewable energies and their integration into the German power grid is currently a primary task of the countrys energy policy.However, the problem of energy storage has not
The past decade has seen a significant rise in the interest of harnessing marine renewable energy.Tidal stream technology is developing rapidly, with the market leaders moving away from a pre-commerci
The Severn Estuary has one of the largest tidal ranges in the world and has long been the subject of consideration for tidal energy generation.
The Three Gorges Project has been put into operation, turning so much mechanical equipment into idleness or scrap, and the site features are going to disappear.
Based on the 1∶40 hydraulic cross section model experiment, the overflow pattern, pressure features of the dam face, aeration effect, the downstream energy dissipation and anti-scouring effect are stu