江厦潮汐试验电站于1985年底建成,是目前我国最大的潮汐电站。电站工程分二期完成,共装机组五台。一期工程的两台机和二期工程的三台机是两种不同结构型式的机组。其中1~#和2~#机是具有行星增速器能正反向发电和正反向泄水的四工况机组(以下简称“增速”机组),3~#、4~#和5~#机则
Jiangxia tidal power station built in the end of 1985, is currently China’s largest tidal power station. Power station project completed in two phases, a total of five units installed. Two machines of the first stage and three machines of the second stage are two different types of units. Among them, No.1 ~ # and 2 ~ # machines are four-working units (hereinafter referred to as “increasing speed” units), 3 ~ #, 4 ~ # and 5 ~ # Machine then