A Uncertain Insurance Model with Variational Lower Limit

来源 :第十三届中国不确定系统年会暨第九届中国智能计算大会 | 被引量 : 0次 | 上传用户:fan20090603
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
  Uncertainty theory provides a new tool to deal with uncertainty.The paper employs it to propose a new uncertain insurance model with variational lower limit, and give a ruin indexes and uncertainty distribution for the uncertain insurance risk process that claim process is a renewal reward process.The model extends and improves uncertain insurance model presented by Liu.Finally, it also provides examples to illustrates effectiveness of the model.
其他文献
在先进场面活动引导和控制系统(Advanced Surface Movement Guidance and Control Systems,A-SMGCS)中,针对不确定事件导致的场面运行效率和安全水平降低,提出一种集成场面态势监测的滑行路由实时更新算法.采用时间窗约束Petri网建立航班场面滑行局部模型;定义局部模型中库所对应时间窗的合并运算规则,据此展开局部模型约简,并给出约简模型中航班滑行冲
震网病毒等事件实证了信息攻击能对信息物理系统带来严重的物理影响.针对这类新的信息安全问题,为了对其风险进行度量,本文提出了基于攻击图的风险评估模型和风险度量指标.综合考虑漏洞固有特性和攻击者能力计算攻击成功概率,根据主机重要程度和漏洞利用模式计算攻击后果.此外,该方法考虑了多步攻击以及攻击行为间的关系,使得计算得到的风险值更符合实际情况.最后,通过仿真实验证明了该方法的准确性与有效性.
高校职工薪资核算及发放由于采取多部门相互独立、分类管理的方式,不利于进行个性化的合理避税.本文引入人工智能原理,提出了税收筹划系统的设计方案.人工智能研究人类智能活动的规律,旨在构造具有感知、推理、学习、联想、决策等思维活动的计算系统,以解决需要人类专家才能处理的复杂问题。高校职工个人薪资税收筹划,是一个需要综合考虑历史薪资水平,职工个人的科研进展状况,学校报酬及奖励政策的变化及各个管理部门的薪资
本文运用最大信息熵理论,讨论了复杂开放系统的动态演化方程在均衡点附近特征值所对应的性态,并在二维空间用具体的实例进行了验证.
Using the concept of credibility measure, this paper proposes a mean-variance hybrid-entropy model which measures the risk of local deviation from the mean as well as the risk of overall deviation fro
In this paper, we investigate the hesitant fuzzy hybrid information aggregation operators in which the attributes are in different priority level.Considering the double impact of priority level of att
This paper analyses the correlative relationship between the financial indicators and non-financial indicators of power grid enterprises, and accordingly sets up an evaluation indicator system of the
According to the generalized distance minimum principle, a selecting model for the optimal evaluation method is built.Based on the model, the rough set theory is taken to be more suitable than the ent
Project scheduling problem is to make a schedule for allocating the loans to a project so as to balance the total cost and the completion time under some constraints.This paper mainly researches on an
Uncertain set is a set-valued function on an uncertainty space, and attempts to model unsharp concepts.Firstly, a new uncertain set N(a, b) called normal is defined, and the parameters a and b2 are pr