A Fast Forecasting Model of Reservoir Sedimentation

来源 :35th IAHR World Congress(第三十五届国际水利学大会) | 被引量 : 0次 | 上传用户:shan12
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
Reservoir sedimentation is investigated and a fast forecasting model of reservoir sedimentation is proposed in this study.
其他文献
Riprap is a common measure for protecting fiver banks against lateral erosion and several methods exist to design them.However, they are generally limited to dumped medium size rocks.
In the Netherlands currently a large number of river intervention works are planned within the Room for the River Program (RfR) and the European Water Framework Directive (WFD).
Wire mesh gabions structures have been introduced since now 120 years in the civil engineering applications.Thanks to their inherent properties (monolithicity, flexibility, permeability, environmental
The alluvial river flows training usually requires an extensive knowledge of the water stream hydraulic/psammology characteristics, terrain geology and the properties of the soil where the alluvial fl
River channel forestation is an important issue considering both environmental and flood protection managements.
Because the channel of the middle reaches of Huaihe River is small and the slope of river is gentle, the flood drainage is often blocked.The flood level is high when middle or small flood happens, and
Based on the observed data and the former research on the width of regulation lines, the runoff and sediment characteristics were analyzed.
Along with the process of accelerative industrialization and the development of economy, more and more dredged sediments are produced by dredging projects, such as port fairway, water conservancy cons
This paper presents a case study of using a tipping flush gate for sediment flushing in an open concrete storm drain.The study was conducted in an open concrete storm drain located in Taman Pekaka, Ni
Combined with the analysis on the features of hydrology and sediment in Jiepai reach, evolution characters of river bed before and after implementation of the engineering, navigation obstacle characte