  As an unwanted by-product in the power plants, cooling water (CW) discharge may induce harmful effects on the coastal environment.In this paper, to accurately predict the CW transport in the Daya Bay, China, we develop a three-dimensional hydrodynamic and temperature model to simulate the transport of the CW from nuclear power plant into coastal waters.Specifically, we use the flow velocity produced by the model to locate Lagrangian coherent structures (LCSs) hidden in ocean surface currents.Result show that the transport of the CW is quite strongly tied to the simulated LCSs.The LCSs constitute fluid barriers that accurately demarcate potential pathway for CW transport.Thus, LCSs in velocity fields from a coastal model is an extremely useful way to monitor and interpret the transport of CW.
其他文献
The paper study the deformation characteristics of the Prefabricated bamboo reinforced porous concrete slab through points with four points focused beam loading method.The results show that flexural b
Nowadays, safety evaluation before bridge opening is increasingly emphasized in China.Bridge inspection is important to guarantee the safe operation of the bridge.In order to comprehensively assess th
Regarding the characteristics of water intaking living example, unusual water supply calculation is performed.The water resource analysis methods of the coastal tidal river network with sluice gates a
The intake tower of a dam is impacted by landslide during the process of reinforcement.The inlet of culvert pipe is pulled open from the connection with the intake tower for about 30cm.Through measure
软基水闸下游河道河床的抗冲刷能力较低,且水闸的泄洪水流条件较复杂,其泄洪消能防冲问题是工程设计和运行极为关心的问题。通过对水闸下游河道消能水位选取、消力池尾坎顶高程、池深、池长及下游海漫段布置等分析,得出了水闸下游消能工布置的优化方法。本文成果可供类似工程设计和运行参考。
某高速公路的路基设计标高为2.65~2.95m,该高速公路所经过的某运河河堤标高约为4.8m,由于公路主线的设计标高低于目前河堤标高、受客观因素影响,只能挖开河堤回填河道做公路路基,原有河道将无法满足泄洪及生态用水要求,因此,高速公路所涉的运河段需要改移(新开河).通过水工模型试验研究,优化了设计方案布置形式,节省工程投资.本试验研究成果,可为同类工程设计和建设提供可借鉴的经验.
为确保电站大坝的安全运行,根据《蓬辣滩水电站安全隐患排查及风险评估报告》中工程安全监测结论与建议,针对蓬辣滩水电站大坝安全监测系统存在的问题及工程实际情况,进行了技术改造设计。
Moderate Heat Portland Cement is not only frequently-used cement for dam but also one of the largest amount of special cement as a main cementitious materials of concrete in hydraulic structure in Chi
Nowadays, safety evaluation before bridge opening is increasingly emphasized in our country.Bridge inspection is important to guarantee the safe operation of the bridge.In order to comprehensively ass
鹅公带滑坡体位于乐昌峡水库库区上游约1.3km的右岸侧,库区河道狭窄,滑坡涌浪会对库区岸坡和挡水大坝等产生明显的不良影响.根据鹅公带滑坡体分布的特点,对其滑坡涌浪影响进行水力模型试验,模拟了滑坡体的下滑过程和滑坡速度,对滑坡涌浪的浪高、漫坝涌浪水量、挡水大坝的涌浪动水压强等特性进行分析,供工程设计和运行参考.