采用水-岩作用线型规划的模拟方法,以白鹤滩水电工程为实例,从水化学方面对坝区复杂水文地质条件作定量分析评价。建立由目标函数和约束条件方程组构成的数学模型,利用Excel规划求解的功能对其进行求解。为评价坝区水文地质条件提供了依据。
Using the simulation method of water-rock interaction linear programming and taking Baihetan hydropower project as an example, the quantitative hydrogeological conditions in dam area are quantitatively evaluated and evaluated from the aspects of hydrochemistry. A mathematical model composed of the objective function and the system of constraints is established and solved by Excel programming. It provides a basis for evaluating hydrogeological conditions in dam area.