印度政府面临处理能源部门巨大亏损的难题。开发巴尔伯蒂工程是该国能源战略的一大变革,该工程的装机为2 070 MW,建成后将推动该国经济的发展。印度经济上可开发的和可行的水电蕴藏量按负荷因数60%计算约为84 000 MW(148 700 MW装机容量)。此外,估计还有6 780 MW小水电和微型水电。现已确定抽水蓄能工程坝址56处,总装机容量94 000 MW。不过,目前仅有15%的水电蕴藏量得到开发,还有7%处于开发的各个阶段。正由于这个原因,印度首家从事水电开发的公用事业公司———国家水电公司(NHPC)开始实施2 070 MW的巴尔伯蒂工程,分3级开发。主要阐述目前正在施工的装机800MW的巴尔伯蒂Ⅱ级工程。Ⅰ级处于勘测阶段,有些环境问题尚未明晰,可能要晚些时候开工,Ⅲ级则等查勘一结束就立马开工。巴尔伯蒂工程位于印度喜马偕尔邦库鲁地区。工程所在地为山区,涉及范围约200 km2。论述了小喜马拉雅山区比亚斯河支流———巴尔伯蒂河的梯级开发,重点讨论了巴尔伯蒂Ⅱ级工程的技术、经济和环境问题。
The Indian government faces the challenge of dealing huge losses in the energy sector. The development of the Balboat project is a major change in the country’s energy strategy. The installed capacity of the project is 2,070 MW, which will boost the country’s economic development when completed. India’s economically exploitable and viable hydropower reserves are estimated to be about 84,000 MW (148,700 MW installed capacity) at a 60% load factor. In addition, an estimated 6 780 MW of small and micro-hydro power are estimated. Has identified pumped storage project dam site 56, with a total installed capacity of 94 000 MW. However, at present, only 15% of the hydropower reserves have been developed and 7% are in various stages of development. It is for this reason that the first public utility company engaged in hydropower development in India, the National Hydropower Company (NHPC), started implementing the 2,707MW Balboat project in three levels. Mainly describes the current construction of the installed capacity of 800MW Balboyd Ⅱ project. Ⅰ level in the survey stage, some environmental issues are not yet clear, may be started later, and so on Ⅲ level survey immediately started. The Balboat Works is located in the Kuru region of Himachal Pradesh, India. The project is located in the mountainous area and covers an area of about 200 km2. This paper discusses the cascade development of the Balboa tributary of the Beas River in the Little Himalayas, and focuses on the technical, economic and environmental issues of the Alberta Class Ⅱ project.