关于深基坑工程SMW工法施工的质量监控措施探讨

来源 :中国港口 | 被引量 : 0次 | 上传用户:sinolee
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
一、工程概况嘉兴港独山港区多用途码头工程位于嘉兴港独山港区,杭州湾北岸,杭州湾跨海大桥与东海大桥之间,西侧为已建的独山港区粮食码头。本工程建设有3.5万吨级多用途泊位2个,年吞吐量为30万TEU,码头面高程8.00m。在本工程查验作业房西北侧,建造一座初期雨水收集池,本初期雨水收集池主要用于降雨过程中前10min的雨水的收集,并设潜水泵,将收集的污水提升至市政污水管网中,以满足环保要求。本工程为地下设备构筑物,构筑物长26.6m,宽7.6m,设备构筑物底到 I. Project Overview The Dushan Port Multipurpose Wharf Project in Jiaxing Port is located between Dushan Port, Jiaxing Port, the north bank of Hangzhou Bay, Hangzhou Bay Cross Sea Bridge and Donghai Bridge, and the west is the Dushan Port Grain Terminal. There are 2 35,000-ton multipurpose berths in this project, with an annual throughput of 300,000TEU and a terminal elevation of 8.00m. In the project inspection northwest side of the operating room, the construction of an initial rainwater collection pool, the initial rainwater collection pool is mainly used for rainfall during the first 10min rainwater collection, and submersible pumps, the sewage collected to the municipal sewage pipe network , To meet the environmental requirements. This project is an underground equipment structure with a structure length of 26.6m and a width of 7.6m. The bottom of the equipment structure
其他文献
路基的强度影响的放置在它的路面层的厚度。更强的路基导致减少放置在路基路面层的设计厚度。对于一个给定的项目工地,现有路基不一定强,因此可能需要升级换代的改善强度方面。
石油化工企业是现代工业体系中极为重要的组成要素,为保证其经营利益,施工企业需要做好工程项目的成本管理与控制工作,这将有利于增加企业经济效益、有利于促进资金流动、有
混凝土工程在施工过程中,时常出现一些问题,直接影响工程质量。针对混凝土工程几种质量问题的产生原因,现简单的谈谈笔者的看法,不对之处敬请批评指正。
这次论坛的主题是“科技推动结构调整,创新提高盈利水平”。这个主题选得好,对钢铁企业以科技进步为动力,克服当前困难,在困难的情况下积极进行结构调整,推动转型升级有重要的现实
随着当前社会经济的发展速度不断加快,各地区的相互练习密度逐渐频繁,因此高速公路的出现给经济的紧密联系和频繁交流提供了基础,所以针对高速公路的质量一定要对其进行全面的要
Objective: Auto-regeneration of the intestinal and ovarian tissue are experiencing degenerative due to protein energy malnutrition (PEM) through of auto-mobiliz
针对安装氧化锌避雷器式故障限流器的500kV输电系统,利用电磁暂态计算程序分析了限流器旁路开关不同断开时间和不同弧道电阻对潜供电流特性的影响。基于等效阻抗网络和拉普拉
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
期刊