论文部分内容阅读
一、工程概况嘉兴港独山港区多用途码头工程位于嘉兴港独山港区,杭州湾北岸,杭州湾跨海大桥与东海大桥之间,西侧为已建的独山港区粮食码头。本工程建设有3.5万吨级多用途泊位2个,年吞吐量为30万TEU,码头面高程8.00m。在本工程查验作业房西北侧,建造一座初期雨水收集池,本初期雨水收集池主要用于降雨过程中前10min的雨水的收集,并设潜水泵,将收集的污水提升至市政污水管网中,以满足环保要求。本工程为地下设备构筑物,构筑物长26.6m,宽7.6m,设备构筑物底到
I. Project Overview The Dushan Port Multipurpose Wharf Project in Jiaxing Port is located between Dushan Port, Jiaxing Port, the north bank of Hangzhou Bay, Hangzhou Bay Cross Sea Bridge and Donghai Bridge, and the west is the Dushan Port Grain Terminal. There are 2 35,000-ton multipurpose berths in this project, with an annual throughput of 300,000TEU and a terminal elevation of 8.00m. In the project inspection northwest side of the operating room, the construction of an initial rainwater collection pool, the initial rainwater collection pool is mainly used for rainfall during the first 10min rainwater collection, and submersible pumps, the sewage collected to the municipal sewage pipe network , To meet the environmental requirements. This project is an underground equipment structure with a structure length of 26.6m and a width of 7.6m. The bottom of the equipment structure