混凝土框架柱、剪力墙成型浇筑时,如振捣不充分,局部可能出现较严重疏松缺损,导致这些承重构件的性能不满足设计要求。针对此常见情况,参考现有相关试验研究结果,结合某项目结构修补方案设计,论述了应用高强低收缩灌浆料置换混凝土柱、墙局部缺损的具体方法,说明了配合检测鉴定要求与修补施工细则,并基于构件截面平衡条件给出了相应的最小剔凿置换深度计算实例。所述项目修补设计方案,经论证实施后已经取得预期的良好效果,可供同类修复工程参考。
Concrete frame columns, shear wall molding pouring, such as vibration is not sufficient, the local may appear more serious loose defects, resulting in the performance of these load-bearing components do not meet the design requirements. Aiming at this common situation, referring to the existing experimental results, combined with the design of a project structure repair scheme, the concrete method of replacing the concrete columns and walls with high strength and low shrinkage grouting material is discussed. The requirements of the cooperation inspection and repair and the repair construction rules , And gives the corresponding calculation example of the minimum displacement permutation based on the condition of component section equilibrium. The project repair design, after demonstration has achieved the expected good results, for similar repair project reference.