论文部分内容阅读
本文对TP55桥机结构参数结合芜湖二桥E-1标段现场具体施工工况进行论述,为30m跨节段箱梁架设施工省时节工,提高工作效率和经济效益。
In this paper, the structural parameters of TP55 bridge machine combined with the specific construction conditions of E-1 section of Wuhu Second Bridge are discussed in this paper, which saves time and labor for the construction of 30m cross-section box girders and increases work efficiency and economic benefits.