论文部分内容阅读
统配煤矿总公司生产局组织、科技局主持的“八一选煤厂计算机控制和管理系统”的鉴定会于1990年8月6日在枣庄矿八一选煤厂举行。并通过了部级鉴定。该项目是中国矿大北京研究生部选矿研究室与八一选煤厂协作完成的。主要针对大、中型选煤厂而开发该控制和管理系统。这个系统包括设备集控、浮选自动化和计算机辅助管理系统三大部分,经国内同行专家鉴定,认为系统达到了国际80年代水平,符合我国国情,属国内首创,是目前选煤厂自动化的一种较好模式。它投资少、见效快、实用可靠、能
The designation of “Computer Control and Management System of Bayi Coal Preparation Plant” presided over by the Production Bureau of the General Bureau of Coal Mine and organized by Science and Technology Bureau was held on August 6, 1990 at the January 1 coal preparation plant of Zaozhuang Mine. And passed ministry appraisal. The project is completed by the China National Minerals Research Laboratory of Beijing Graduate Department and the Bayi Coal Preparation Plant. Mainly for large and medium-sized coal preparation plant and the development of the control and management system. This system includes equipment control, flotation automation and computer-aided management system of three parts, identified by domestic experts, that the system reached the international 80’s level, in line with China’s national conditions, is a national initiative, is the coal preparation plant automation A better model. It invests less, quick, practical and reliable, can