本文介绍了隘口水库右岸下层灌浆平洞进口段开挖与基坑大面积固结灌浆交叉施工状态下的开挖技术详细分析了在水库施工中多种因素制约情况下的灌浆平洞进口段开挖的施工工艺以供交流。
This paper introduces the excavation technology under the cross-construction condition of excavation and large-area consolidation grouting in the lower grout hole on the right bank of the right bank of the Weiguo Reservoir. The paper analyzes the excavation technology under the cross-construction condition of the grouting hole under the constraints of various factors Digging construction process for exchange.