论文部分内容阅读
根据司马三期泵站因出水池运行水位过低,使出水流道不能形成有效虹吸,造成装置效率低下、机组振动及噪音严重等具体问题,提出延长出水流道,降低出口高程的方法,有效地解决了上述难题。
According to the specific problems such as Sima Phase III pump station running out of water due to the reservoir is too low, the effluent can not form an effective siphon, resulting in low efficiency of the unit, unit vibration and noise and other specific issues, proposed to extend the effluent channel to reduce the exit elevation method is effective Solve the above problems.