论文部分内容阅读
从绿树成荫到白雪皑皑,随着季节的变迁,2015年北京CBD核心区的建设经历了12个月的更替。我们用12张照片记录了CBD核心区建设的变化过程,照片中与国贸三期几乎垂直,又遥相呼应的那条道路是景辉街,它将CBD核心区一分为二,右侧为北区,左侧为南区。在北区,“万丈高楼平地起”。从东三环到眼前,由远及近,分别是Z1a中期、Z2a阳光、Z1b清华、Z2b三星、Z15中信(中国尊)、Z14正大,其中Z15中信(中国尊)的建设始终一马当先,不断刷新着高度,而在它的周围,其它项目也在紧紧跟随,节
From tree-lined to snow-capped, with the seasonal changes, the construction of the core area of Beijing CBD has undergone a 12-month replacement in 2015. We used 12 pictures to record the change of the construction of the CBD core area. The photo is almost perpendicular to the third phase of the international trade. The road that echoes further is Jing-Hui Street, which divides the CBD core area into two parts and the north part to the north , On the left for the South. In the North District, “lofty high rise flat ”. From the East Third Ring to the immediate, from far and near, respectively, Z1a mid-term, Z2a sunshine, Z1b Tsinghua University, Z2b Samsung, Z15 CITIC (China respect), Z14 Chia Tai Z15 CITIC (China respect) construction has always been the first to constantly refresh The height, and around it, other projects are also closely followed, section