论文部分内容阅读
文章利用1981~2014年磴口(二)站和库区实测水文资料,从输沙量、含沙量、输沙率等多方面分析了三盛公水利枢纽库区泥沙及库容变化趋势。
Based on the measured hydrological data at stations (Ⅱ) and the reservoir from 1981 to 2014, the paper analyzes the change tendency of sediment and reservoir capacity of Sanshenggong Water Resources and Hydropower Project from sediment transport, sediment concentration and sediment transport rate.