论文部分内容阅读
走进太行山,走进为2008北京奥运供电的装机120万千瓦的张河湾抽水蓄能电站,走进中国水电一局机电安装分局项目部,人们的心无时无刻不被“成功”二字叩击着,为取得的成功兴奋着、思忖着。倏地,在引水系统长长的压力钢管道上闪烁着三个耀眼的亮点,顺着亮点一步一步地寻觅探访,发现了那荧荧光亮处蕴藏着比金子还贵的东西。
Into the Taihang Mountains, into the 2008 Beijing Olympic power supply installed capacity of 1200000 kilowatts Zhanghewan pumped storage power station, into the China Hydropower Bureau Electrical and Mechanical Installation Branch Project Department, people’s hearts all the time without being “successful” word Tapping, excited for success, thinking. In a nutshell, three dazzling highlights shone brightly on the long steel pipelines of the water diversion system. Looking one step at a time and looking for a visit, they found that the fluorescent light contained something more expensive than gold.