摘要:一般在房屋建设施工当中,对于基坑作业通常是在城市中进行开挖,所以,这就影响到了已有的建筑物以及构筑物和部分地下管线等设施,从而严重威胁到了其重要的安全性,如果基坑出现问题时,则会发生极为严重的后果。此外,一般在深基坑的内撑体系当中,由于换撑施工是一个非常严格的过程,因此,对于在房建工程当中的换撑施工技术做了相应的分析研究并进行探讨。
关键词:房建工程; 深基坑; 内撑体系; 换撑技术
Abstract:In housing construction, the foundation work is usually in the city were excavated, so, it will affect the existing buildings and structures and underground pipelines and other facilities, and a serious threat to the safety of foundation pit, if problems occur, extremely serious consequences. In addition, generally in deep foundation pit supporting system, for supporting construction is a very strict process, therefore, for in house building engineering construction technology of support replacement did corresponding analysis and discussion.
key words:Building engineering;Deep foundation pit;Internal shoring system;Support replacement technique
中图分类号:TU761文献标识码: A 文章编号:
在房屋工程的建设施工过程中,由于在进行基坑支护的施工时,一般造价较高,并且工期较长,所以在整个施工阶段是极为重要的。在基坑支护设计当中,其形式是多种多样的,同时也受到了工程的地质条件以及所处的位置环境影响,受到了各方面的制约,所以即要适用又要经济的支护条件通常不是很多。当前,由于混凝土的内支撑体系对环境的要求不太高,同时也方便施工,所以已经很广泛的应用在工程当中。由于受到基坑支撑的相对制约,所以当施工到必要的部位时,就必须要对内支撑进行拆除,这也是一个重要的过程。
一、对于换撑技术的主要原理
由于在深基坑支护的过程当中,作为混凝土的内支撑它是具有过渡性的支撑体系,在建设工程作业到相应部位时,就应拆除全部的支撑体系。而对于换撑原理它一般就是应用到传力构件从而促使支护桩会因为有内支撑的存在再进行拆除,在其后所形成的应力可以传递到具有较强承受能力的构件当中,也就是在施工结束以后,并达到了一定强度的地下室外墙壁等支撑, 但支护体系仍然会持续发挥它的支护作用,同时也是应用了相当数目的支撑物从而设置地下室外墙部位,但有时也会通过设置传力带,再通过基坑回填施工,促使地下室结构和回填物进行共同的受力,从而可以控制出现变形的可能。
二、结合工程实例分析
某建筑项目占地约8300m2的面积,而地下大约为19000m2的面积,在地上为28 层,高度大约为85m,在地下为两层。在建设工程当中,其基础结构主要包括了桩基础、筏板基础、承台基础等,对于主体结构的主要形式结构就是现浇钢筋砼框剪,而工程主要应用的就是弹性聚合物作为外防水体系。建筑的基础厚度大约在1.4m至1.8m左右,在局部的底板大约是3m的厚度,而在裙房的底板在0.6m至0.8m左右的厚度,在工程基础顶部的标高大约在-7.60m左右。从施工的地质情况来看,其表层的厚度大约是2.5m,并且其内为杂填土,而高程大约为-1.82m至-41.62m左右,主要是粉质粘土,而在-56.62m至-79.12m一般是粉砂层,所以地质条件相对比较差,而且地下的水位也偏高。而在这项工程当中,其东侧与居民区路的距离比较近,而在西、南、北侧则离市中心的道路大约在10m至20m左右,而该工程的周边环境有着比较密集的市政管线,在其它几侧的道路均是交通干道,管网集中区。对此,在根据这些较为特殊的现场环境,在该项施工当中,主要应用了排桩式的支护形式。在进行排桩时可以应用700mm和800mm桩径的钻孔桩,把桩距控制在800mm与1000mm左右,并且要做止水帷幕。
三、根据工程的具体分析方案
在本工程当中,由于工程期限比较紧张,又因为在工程所处的位置其地下水位会偏高,所以必须要进行加设相关的防水体系,从而也就增加了施工工程的具体时间。然而,由于工程在设置传力带时的操作方法和回填施工的措施不够完善,所以必须要通过设置刚性的支撑物以达到换撑的目的。
(一)、一般在剪力墙的浇筑当中,处于支护桩位置的剪力墙必须要对其位置进行预留钢板,再把钢梁的一端直接焊接到预留钢板处,而在其另一端应连接到支护桩处,再通过钢构梁设置在支护桩一侧,从而连接桩成为整体。通过应用这种方式最在的特点就是具有较大刚度的支撑,并且在早期可以对钢构件进行加工、减少时间,同时当拆除的支撑钢构还可以进行循环利用。
(二)、在对底板进行施工的过程当中,由于支护桩和底板之间主要是应用了砼浇筑,所以,在对负二层结构的顶板进行施工时,可以把砼支撑设于纵横墙的位置,从而把混凝土结构以及支护桩共同构建为一个整体。而应用此方法的最大特点就是因其施工的进度较快并且具有很大的刚度,可以降低经济成本。
四、开展施工的主要技术应用
(一)、在通过钻孔咬合桩围护结构再与内钢管支撑技术的要求标准相结合,在周围环境的建筑物、详细的地质资料、地下管线等相关的资料,从而认真仔细对基坑施工做好组织设计工作以及严格的施工操作技术。由于在开挖过程当中可能会出现边坡稳定以及渗水和涌泥流砂等状况,因此必须要对其施工技术加以研究分析,并提出相应的解决措施,提前做好物资储备工作。与此同时也应做好地面的排水以及做好基坑的抽排水系统。再按照设计的具体要求,加工钢支撑,备好出土、弃土以及运输等,并可以保证连续开挖。此外,还应准备足够运输和开挖的机械设备,并保证可以正常作业。
(二)、在根据地质的具体资料,对管井可应用滤水管,并且在滤水井管的过滤位置可以应用钢筋焊接骨架。在设计基坑时,其水位应降到基底位置以下1m左右,而在主体基坑内的管井在沿着基坑中线偏两侧的位置3m左右,设置为梅花形,把降水井的间距设置大约20m左右,同时要避开支撑和底梁的位置。并且要在基坑的外侧每20m处设置一个水位检查井,作为应急措施。
(三)、在进行二次支撑施工时主要技术体现在,一方面是,在进行负二层顶板的施工时,必须要保持其支撑位置的钢筋混凝土再与地下室结构要进行同步,并且应对砼和二层结构板在强度的大小方面保持一致。另一方面,为了避免围护与主体结构发生不均匀的沉降,因此,因施工过程当中就必须要在桩和支撑结构的砼之间铺设油毡处理。而一般在拆除支撑的施工当中,主要就是应用静压爆破以及人工拆除的方法,但通过现场施工的具体情况,一般应用的方法还是人工拆除。
(四)、在拆除的施工當中,必须要根据支撑梁的主要特征,再应用空压机分块破碎混凝土支撑梁,通过分段拆除以后再快速的运离混凝土,并进行破碎处理。进行拆撑时,它的主要顺序一般就是以不同梁其受力的大小,再拆除撑间零杆、拆除斜向梁,直到拆除最后的主梁。再拆除施工当中所掉落的破碎砼必须要进行及时清理,以避免板面的堆载过大。
结论:
总之,由于在换撑的施工过程当中主要是应用了混凝土的传力构件,并且它在一定程度上会有很大的优势,尤其体现在具有良好的防水性、便捷的操作、利于回填土施工以及也提高了施工质量等相关方面的内容。同时,在内支撑进行拆除时必须要根据施工的具体需要,从而选择在破碎后再进行切块拆除,以实现工程项目的具体要求,同时在一定程度上也可以确保有序的开展施工工程。对此,在实践当中所证明,在换撑技术中应用了混凝土的传力构件措施,它不会对回填土施工以及地下室的防水系统造成一定的影响,并且投入比较少、工期较短,而且施工也较为简单,具有良好的效果。
参考文献:
[1]成关锋.深基坑工程中换撑技术的应用[J].建筑技术.2005(12)
[2]耿晨光.基坑内撑体系换撑的施工技术[J].民营科技.2011(7)
[3]姚程天.郭金宏.景玉春.深基坑内撑体系换撑施工技术的应用[J].科技资讯.2009(3)
[4]王立衡.深基坑板带式内支撑转换施工法[J].城市建设理论研究.2011(16)
[5]师文君.刘春玲.高层建筑中的深基坑内撑体系换撑施工技术[J].改革与开放.2010(16)
[6]张东.基坑支护工程的换撑施工技术[D].第十届全国地基处理学术讨论会.2008
关键词:房建工程; 深基坑; 内撑体系; 换撑技术
Abstract:In housing construction, the foundation work is usually in the city were excavated, so, it will affect the existing buildings and structures and underground pipelines and other facilities, and a serious threat to the safety of foundation pit, if problems occur, extremely serious consequences. In addition, generally in deep foundation pit supporting system, for supporting construction is a very strict process, therefore, for in house building engineering construction technology of support replacement did corresponding analysis and discussion.
key words:Building engineering;Deep foundation pit;Internal shoring system;Support replacement technique
中图分类号:TU761文献标识码: A 文章编号:
在房屋工程的建设施工过程中,由于在进行基坑支护的施工时,一般造价较高,并且工期较长,所以在整个施工阶段是极为重要的。在基坑支护设计当中,其形式是多种多样的,同时也受到了工程的地质条件以及所处的位置环境影响,受到了各方面的制约,所以即要适用又要经济的支护条件通常不是很多。当前,由于混凝土的内支撑体系对环境的要求不太高,同时也方便施工,所以已经很广泛的应用在工程当中。由于受到基坑支撑的相对制约,所以当施工到必要的部位时,就必须要对内支撑进行拆除,这也是一个重要的过程。
一、对于换撑技术的主要原理
由于在深基坑支护的过程当中,作为混凝土的内支撑它是具有过渡性的支撑体系,在建设工程作业到相应部位时,就应拆除全部的支撑体系。而对于换撑原理它一般就是应用到传力构件从而促使支护桩会因为有内支撑的存在再进行拆除,在其后所形成的应力可以传递到具有较强承受能力的构件当中,也就是在施工结束以后,并达到了一定强度的地下室外墙壁等支撑, 但支护体系仍然会持续发挥它的支护作用,同时也是应用了相当数目的支撑物从而设置地下室外墙部位,但有时也会通过设置传力带,再通过基坑回填施工,促使地下室结构和回填物进行共同的受力,从而可以控制出现变形的可能。
二、结合工程实例分析
某建筑项目占地约8300m2的面积,而地下大约为19000m2的面积,在地上为28 层,高度大约为85m,在地下为两层。在建设工程当中,其基础结构主要包括了桩基础、筏板基础、承台基础等,对于主体结构的主要形式结构就是现浇钢筋砼框剪,而工程主要应用的就是弹性聚合物作为外防水体系。建筑的基础厚度大约在1.4m至1.8m左右,在局部的底板大约是3m的厚度,而在裙房的底板在0.6m至0.8m左右的厚度,在工程基础顶部的标高大约在-7.60m左右。从施工的地质情况来看,其表层的厚度大约是2.5m,并且其内为杂填土,而高程大约为-1.82m至-41.62m左右,主要是粉质粘土,而在-56.62m至-79.12m一般是粉砂层,所以地质条件相对比较差,而且地下的水位也偏高。而在这项工程当中,其东侧与居民区路的距离比较近,而在西、南、北侧则离市中心的道路大约在10m至20m左右,而该工程的周边环境有着比较密集的市政管线,在其它几侧的道路均是交通干道,管网集中区。对此,在根据这些较为特殊的现场环境,在该项施工当中,主要应用了排桩式的支护形式。在进行排桩时可以应用700mm和800mm桩径的钻孔桩,把桩距控制在800mm与1000mm左右,并且要做止水帷幕。
三、根据工程的具体分析方案
在本工程当中,由于工程期限比较紧张,又因为在工程所处的位置其地下水位会偏高,所以必须要进行加设相关的防水体系,从而也就增加了施工工程的具体时间。然而,由于工程在设置传力带时的操作方法和回填施工的措施不够完善,所以必须要通过设置刚性的支撑物以达到换撑的目的。
(一)、一般在剪力墙的浇筑当中,处于支护桩位置的剪力墙必须要对其位置进行预留钢板,再把钢梁的一端直接焊接到预留钢板处,而在其另一端应连接到支护桩处,再通过钢构梁设置在支护桩一侧,从而连接桩成为整体。通过应用这种方式最在的特点就是具有较大刚度的支撑,并且在早期可以对钢构件进行加工、减少时间,同时当拆除的支撑钢构还可以进行循环利用。
(二)、在对底板进行施工的过程当中,由于支护桩和底板之间主要是应用了砼浇筑,所以,在对负二层结构的顶板进行施工时,可以把砼支撑设于纵横墙的位置,从而把混凝土结构以及支护桩共同构建为一个整体。而应用此方法的最大特点就是因其施工的进度较快并且具有很大的刚度,可以降低经济成本。
四、开展施工的主要技术应用
(一)、在通过钻孔咬合桩围护结构再与内钢管支撑技术的要求标准相结合,在周围环境的建筑物、详细的地质资料、地下管线等相关的资料,从而认真仔细对基坑施工做好组织设计工作以及严格的施工操作技术。由于在开挖过程当中可能会出现边坡稳定以及渗水和涌泥流砂等状况,因此必须要对其施工技术加以研究分析,并提出相应的解决措施,提前做好物资储备工作。与此同时也应做好地面的排水以及做好基坑的抽排水系统。再按照设计的具体要求,加工钢支撑,备好出土、弃土以及运输等,并可以保证连续开挖。此外,还应准备足够运输和开挖的机械设备,并保证可以正常作业。
(二)、在根据地质的具体资料,对管井可应用滤水管,并且在滤水井管的过滤位置可以应用钢筋焊接骨架。在设计基坑时,其水位应降到基底位置以下1m左右,而在主体基坑内的管井在沿着基坑中线偏两侧的位置3m左右,设置为梅花形,把降水井的间距设置大约20m左右,同时要避开支撑和底梁的位置。并且要在基坑的外侧每20m处设置一个水位检查井,作为应急措施。
(三)、在进行二次支撑施工时主要技术体现在,一方面是,在进行负二层顶板的施工时,必须要保持其支撑位置的钢筋混凝土再与地下室结构要进行同步,并且应对砼和二层结构板在强度的大小方面保持一致。另一方面,为了避免围护与主体结构发生不均匀的沉降,因此,因施工过程当中就必须要在桩和支撑结构的砼之间铺设油毡处理。而一般在拆除支撑的施工当中,主要就是应用静压爆破以及人工拆除的方法,但通过现场施工的具体情况,一般应用的方法还是人工拆除。
(四)、在拆除的施工當中,必须要根据支撑梁的主要特征,再应用空压机分块破碎混凝土支撑梁,通过分段拆除以后再快速的运离混凝土,并进行破碎处理。进行拆撑时,它的主要顺序一般就是以不同梁其受力的大小,再拆除撑间零杆、拆除斜向梁,直到拆除最后的主梁。再拆除施工当中所掉落的破碎砼必须要进行及时清理,以避免板面的堆载过大。
结论:
总之,由于在换撑的施工过程当中主要是应用了混凝土的传力构件,并且它在一定程度上会有很大的优势,尤其体现在具有良好的防水性、便捷的操作、利于回填土施工以及也提高了施工质量等相关方面的内容。同时,在内支撑进行拆除时必须要根据施工的具体需要,从而选择在破碎后再进行切块拆除,以实现工程项目的具体要求,同时在一定程度上也可以确保有序的开展施工工程。对此,在实践当中所证明,在换撑技术中应用了混凝土的传力构件措施,它不会对回填土施工以及地下室的防水系统造成一定的影响,并且投入比较少、工期较短,而且施工也较为简单,具有良好的效果。
参考文献:
[1]成关锋.深基坑工程中换撑技术的应用[J].建筑技术.2005(12)
[2]耿晨光.基坑内撑体系换撑的施工技术[J].民营科技.2011(7)
[3]姚程天.郭金宏.景玉春.深基坑内撑体系换撑施工技术的应用[J].科技资讯.2009(3)
[4]王立衡.深基坑板带式内支撑转换施工法[J].城市建设理论研究.2011(16)
[5]师文君.刘春玲.高层建筑中的深基坑内撑体系换撑施工技术[J].改革与开放.2010(16)
[6]张东.基坑支护工程的换撑施工技术[D].第十届全国地基处理学术讨论会.2008