灌河大桥采用双塔双索面半漂浮体系钢与混凝土组合梁斜拉桥。在总结其他斜拉桥合龙经验的基础上,结合实际施工进度,采用低温时段定时法技术进行合龙。定时合龙技术在合龙口旁前2个梁段安装前,对扩大的合龙口进行连续观测,对合龙杆件提前下料,在标准梁段安装完成后,根据监控结果吊装合龙杆件完成合龙。此技术以长圆孔工具连接板、临时匹配件为辅助合龙工具,先将合龙口状态固定,再通过实际测量确定永久拼接板尺寸,最后将工具连接板替换为永久连接板,完成主梁合龙。
Gully bridge with double towers double cable plane semi-floating system steel and concrete composite beam cable-stayed bridge. On the basis of summarizing the experience of other cable-stayed bridges, combining with the actual progress of construction, the low-temperature time-keeping technique is used to make the dragon. Timing Closure Technology Before the installation of the two beam sections in front of the Closure port, the expanded Closure port is continuously observed and the Closure part is fed in advance. After the installation of the standard beam section is completed, the Closure part is hoisted and completed according to the monitoring result. This technology to the long hole tool connecting plate, the temporary matching pieces for the auxiliary tool for the closure of the first closure of the state of fixed mouth, and then through the actual measurement to determine the size of the permanent splicing plate, and finally the tool plate to replace the permanent connection plate to complete the main beam closure.