论文部分内容阅读
概述了网络计划优化的概念及内容,介绍了用计算机实现工期资源优化和工期成本优化的思路、步骤和程序流程框图,并给出了一个工期资源优化的简例。
The concept and content of network planning optimization are summarized. The ideas, steps and program flow diagrams of using computer to realize the optimization of construction period resources and the cost of construction period are introduced. A brief example of the optimization of construction period resources is given.