论文部分内容阅读
甘肃省玉门地区风能资源丰富,有着得天独厚的风电发展条件。基于清洁发展机制CDM(Clean Development Mechanism)的要求,从CDM项目额外性分析、基准线情景识别两方面探讨了甘肃玉门发展CDM风电项目的适宜性与潜力,并回顾了玉门地区发展CDM项目的实践情况。此外根据计算确定的基准线排放因子,并结合玉门地区不同时期装机容量的变化,讨论了目前、规划期间及未来开发中玉门地区拟定CDM风电项目的相对CO2减排量与减排效益变化,为获取各种资源发展CDM风电项目提供了依据。
Yumen, Gansu Province, rich in wind energy resources, has a unique wind power development conditions. Based on the Clean Development Mechanism (CDM) requirements, this paper discusses the suitability and potential of developing CDM wind power project in Yumen, Gansu from the aspects of CDM project additionality analysis and baseline scenario identification, and reviews the development of CDM project in Yumen area Practice. In addition, based on the calculation of the baseline emission factor and the changes of installed capacity at different periods in the Yumen area, the relative emission reduction and emission reduction benefits of CDM projects in the Yumen area during the planning, future and future development are discussed , Provided the basis for various resources to develop CDM wind power projects.