论文部分内容阅读
水利大坝地基是水利工程的基础,主要起保护水利工程的作用,使工程能够安全稳定,地基的基础作用使其在施工的时候,得到很多的重视。地基在施工的时候,要将设计的施工结构优化,而且还要使用科学的施工技术,保证地基施工的效果。现在地基施工中效果最好的施工技术是振冲碎石桩处理技术,这种技术能将振冲碎石技术的时间缩短,而且还能保证施工的效率。使用这种施工技术最主要的是,能够提高水利工程的承载力。主要探讨了振冲碎石技术。
Water dam foundation is the basis of water conservancy projects, mainly from the protection of water conservancy projects, so that the project can be safe and stable, the foundation of the foundation to make it in the construction time, get a lot of attention. When the foundation is under construction, it is necessary to optimize the construction structure of the design, but also to use the scientific construction technology to ensure the foundation construction effect. Now the most effective construction technology in the construction of foundation is vibratory stone processing technology, which can shorten the time of vibroflotation technology, but also ensure the construction efficiency. The most important thing about using this kind of construction technology is to improve the carrying capacity of water conservancy projects. Vibrating stone technology is mainly discussed.