摘要:随着时代的进步,高速光纤通信成为提供大容量传输信道的主要手段。光缆传输性能的优势、线路施工质量的好坏均直接影响系统的通信质量。本文通过对光缆通信线路工程的研究,介绍了光缆通信线路施工的几项关键技术。
关键词:光纤;线路;施工技术
Abstract: with the progress of The Times, high-speed optical fiber communication become provide large capacity transmission channel main means. Fiber optic cable transmission performance advantage, line construction the stand or fall of quality are directly affect the quality of the communication system. This article through to cable communication line engineering research, this article first introduced the optical cable communication line construction of several key technologies.
Keywords: optical fiber; Line; Construction technology
中图分类号:TU74 文献标识码:A 文章编号:2095-2104(2013)
一、光缆线路的施工程序
①光缆的单盘检验;②路由复测:按施工设计图,复核路由的走向、敷设条件、环境条件以及接头位置等;③光缆配盘:是根据复测路由计算敷设总长度和合理地选配光缆盘长;④路由准备:管道光缆敷设前管道清理、预放铁丝或预放塑料导管,架空敷设前预放钢丝绳、接头坑的设置等;⑥光缆敷设:根据敷设方式,将单盘光缆架挂到电杆上或拉放到管道内、或放入光缆沟中;⑦光缆接续安装:包括光纤接续、铜导线、铝护层等的测量;⑧中繼测量:包括光纤特性(如光纤的总衰减等)测试和铜线电性能的测试等;⑨光缆竣工验收:提供施工图、修改路由图及测量数据等技术资料,并做好随工检验和竣工验收工作,以提供合格的光纤线路,确保系统的调测。二、光缆通信线路施工关键技术
(一)光缆配盘
1、光缆配盘方法根据光缆线路的总长度,结合线路路由、地形的变化与给定的光缆数量和光缆盘规格,首先把光缆按顺序排列标明盘号,制定出各中继段内的光缆配盘计划,然后把光缆有计划的送往各光缆屯放点,每个屯放点都要有专人看管。
2、光缆配盘后接头位置的要求(1)管道光缆接头应避开交通繁忙的要塞道口;(2)直埋光缆接头应设在地势平坦和地质稳固的地点,尽量避开水塘、河流、沟渠、沼泽和道路等不安全地方;(3)架空光缆接头应落在杆上或杆旁1m以内。
(二)光缆敷设
光缆敷设前应按本设计的施工图进行线路路由复测,标出线位,丈量划线,测出到各基站的准确长度,因外界条件变化,复测时可根据局部地段实际情况,在光缆路由长度变化不多的前途下,允许光缆路由做适当调整。
1、架空光缆的敷设与安装 (1)架空光缆采用挂钩吊挂,在原吊杆线上加挂一条光缆,光缆挂钩程式换为35mm。原有一条吊线有两条以上光缆时,应另外架设吊线。本工程原吊线上加挂光缆处,经与建设单位协商,按每公里1000个计算。其安装应符合设计规范和“本地网通信线路工程验收规范”的相关规定。 (2)光缆接头盒固定在电杆上,接头预留同时安装在同一根电杆预留架上,拆改光缆接头盒时,新给一个但光缆预留安装在接头盒的前一根杆上,预留本次新建光缆。
2、管道光缆的敷设与安装市区管道按人工敷设方式考虑,宜采用整盘敷设。推荐采用机械牵引敷设。为了减少布放张力,整盘光缆可盘8字由中间向两边布放,光缆在人孔中应有醒目的识别标志如光缆标志牌等,并用塑料软管保护。光缆进出管孔时应用自粘胶带封堵。
(三)光缆的接续
1、光缆的开剥(1)开剥光缆过程中,要确保松套管及光纤无划伤,无硬折;(2)擦洗光纤松套管及光纤时,严禁从光缆端头向开剥点反方向擦拭,这样极易使检套管硬折和光纤折断,造成开剥失败;(3)根据光缆接头盒的结构确定光缆的开剥长度;(4)有开剥绳和无开剥绳光缆外护套开剥
2、光缆缆芯的整理(1)松开填充绳、松套管的扭绞,分开加强芯、填充绳、松套管;(2)按开剥尺寸要求剪断加强芯;(3)用开剥器或刀片开剥松套管 (也可以先不开剥),初步清洗光纤;(4)开剥工程光纤不可落地
3、 接头盒准备 (1)将接头盒打开,将光缆加强芯固定在接头盒内;(2)按照光缆外径尺寸选择密封器件;(3)开剥、固定松套管(或软管);(4)再次确认光纤长度 再次确认光纤长度。
(四)光缆线路验收
光缆线路验收由施工单位、设计人员、随工人员及相关部门等参加。验收时,应严格检查工程质量,审查竣工资料;合格后,维护单位签发验收证书,办理移交手续。对发现的工程质量问题,要提出处理意见,并要求责任单位落实解决。①检查项目:光缆路由和位置、光缆埋深和保护、光缆的三防措施、光缆接续和接头保护、路由标石和标志、光缆护套对地绝缘、竣工资料等。②质量要求:光缆的敷设位置及接头点环境安全可靠,便于施工和维护。光缆与树木、建筑物和与其它设施的距离符合规范要求规定。按抽验50%光缆的路由和位置,以实查结果进行评定验收质量。
结束语
发展高速光纤通信是社会信息化的需要,新技术的不断出现必然推动光缆通信的进一步发展。对于光缆线路工程,相关工作人员一定要掌握线路的有关理论和施工技术,把我国的通信网建成完整、统一、先进的网络。
参考文献
[1]柳春锋.光纤通信技术[M].北京:北京理工大学出版社,2007.6:96-97.
[2]陈世杯.浅谈通信工程概预算的审计方法[J].攀枝花市邮电局:四川通信技术,1996(12):38-39.
[3]王海清.关于光缆网络设计方法的探讨[J].西部广播电视,2004(6):59-61.
[4]杨艳红.基于PON的FTTH线路工程设计[J].电信技术,2008(12):107-109.
关键词:光纤;线路;施工技术
Abstract: with the progress of The Times, high-speed optical fiber communication become provide large capacity transmission channel main means. Fiber optic cable transmission performance advantage, line construction the stand or fall of quality are directly affect the quality of the communication system. This article through to cable communication line engineering research, this article first introduced the optical cable communication line construction of several key technologies.
Keywords: optical fiber; Line; Construction technology
中图分类号:TU74 文献标识码:A 文章编号:2095-2104(2013)
一、光缆线路的施工程序
①光缆的单盘检验;②路由复测:按施工设计图,复核路由的走向、敷设条件、环境条件以及接头位置等;③光缆配盘:是根据复测路由计算敷设总长度和合理地选配光缆盘长;④路由准备:管道光缆敷设前管道清理、预放铁丝或预放塑料导管,架空敷设前预放钢丝绳、接头坑的设置等;⑥光缆敷设:根据敷设方式,将单盘光缆架挂到电杆上或拉放到管道内、或放入光缆沟中;⑦光缆接续安装:包括光纤接续、铜导线、铝护层等的测量;⑧中繼测量:包括光纤特性(如光纤的总衰减等)测试和铜线电性能的测试等;⑨光缆竣工验收:提供施工图、修改路由图及测量数据等技术资料,并做好随工检验和竣工验收工作,以提供合格的光纤线路,确保系统的调测。二、光缆通信线路施工关键技术
(一)光缆配盘
1、光缆配盘方法根据光缆线路的总长度,结合线路路由、地形的变化与给定的光缆数量和光缆盘规格,首先把光缆按顺序排列标明盘号,制定出各中继段内的光缆配盘计划,然后把光缆有计划的送往各光缆屯放点,每个屯放点都要有专人看管。
2、光缆配盘后接头位置的要求(1)管道光缆接头应避开交通繁忙的要塞道口;(2)直埋光缆接头应设在地势平坦和地质稳固的地点,尽量避开水塘、河流、沟渠、沼泽和道路等不安全地方;(3)架空光缆接头应落在杆上或杆旁1m以内。
(二)光缆敷设
光缆敷设前应按本设计的施工图进行线路路由复测,标出线位,丈量划线,测出到各基站的准确长度,因外界条件变化,复测时可根据局部地段实际情况,在光缆路由长度变化不多的前途下,允许光缆路由做适当调整。
1、架空光缆的敷设与安装 (1)架空光缆采用挂钩吊挂,在原吊杆线上加挂一条光缆,光缆挂钩程式换为35mm。原有一条吊线有两条以上光缆时,应另外架设吊线。本工程原吊线上加挂光缆处,经与建设单位协商,按每公里1000个计算。其安装应符合设计规范和“本地网通信线路工程验收规范”的相关规定。 (2)光缆接头盒固定在电杆上,接头预留同时安装在同一根电杆预留架上,拆改光缆接头盒时,新给一个但光缆预留安装在接头盒的前一根杆上,预留本次新建光缆。
2、管道光缆的敷设与安装市区管道按人工敷设方式考虑,宜采用整盘敷设。推荐采用机械牵引敷设。为了减少布放张力,整盘光缆可盘8字由中间向两边布放,光缆在人孔中应有醒目的识别标志如光缆标志牌等,并用塑料软管保护。光缆进出管孔时应用自粘胶带封堵。
(三)光缆的接续
1、光缆的开剥(1)开剥光缆过程中,要确保松套管及光纤无划伤,无硬折;(2)擦洗光纤松套管及光纤时,严禁从光缆端头向开剥点反方向擦拭,这样极易使检套管硬折和光纤折断,造成开剥失败;(3)根据光缆接头盒的结构确定光缆的开剥长度;(4)有开剥绳和无开剥绳光缆外护套开剥
2、光缆缆芯的整理(1)松开填充绳、松套管的扭绞,分开加强芯、填充绳、松套管;(2)按开剥尺寸要求剪断加强芯;(3)用开剥器或刀片开剥松套管 (也可以先不开剥),初步清洗光纤;(4)开剥工程光纤不可落地
3、 接头盒准备 (1)将接头盒打开,将光缆加强芯固定在接头盒内;(2)按照光缆外径尺寸选择密封器件;(3)开剥、固定松套管(或软管);(4)再次确认光纤长度 再次确认光纤长度。
(四)光缆线路验收
光缆线路验收由施工单位、设计人员、随工人员及相关部门等参加。验收时,应严格检查工程质量,审查竣工资料;合格后,维护单位签发验收证书,办理移交手续。对发现的工程质量问题,要提出处理意见,并要求责任单位落实解决。①检查项目:光缆路由和位置、光缆埋深和保护、光缆的三防措施、光缆接续和接头保护、路由标石和标志、光缆护套对地绝缘、竣工资料等。②质量要求:光缆的敷设位置及接头点环境安全可靠,便于施工和维护。光缆与树木、建筑物和与其它设施的距离符合规范要求规定。按抽验50%光缆的路由和位置,以实查结果进行评定验收质量。
结束语
发展高速光纤通信是社会信息化的需要,新技术的不断出现必然推动光缆通信的进一步发展。对于光缆线路工程,相关工作人员一定要掌握线路的有关理论和施工技术,把我国的通信网建成完整、统一、先进的网络。
参考文献
[1]柳春锋.光纤通信技术[M].北京:北京理工大学出版社,2007.6:96-97.
[2]陈世杯.浅谈通信工程概预算的审计方法[J].攀枝花市邮电局:四川通信技术,1996(12):38-39.
[3]王海清.关于光缆网络设计方法的探讨[J].西部广播电视,2004(6):59-61.
[4]杨艳红.基于PON的FTTH线路工程设计[J].电信技术,2008(12):107-109.