论文部分内容阅读
一九八一年五月召开的全国水利管理会议,决定把水利工作的着重点转移到管理上来。首先是加强现有工程的管理。建国三十二年来,抚州地区兴建了一大批水利工程,有效灌溉面积达到总耕地面积的78%。从县至公社都形成了自己的蓄、引、提灌溉系统。但是,由于不少工程在兴建时急于求成。忽视质量,放松配套;在运用时不重视技术管理,不讲究实际效果,造成水库不能按设计蓄水,有的渠道则淤塞严重,使工程效益不能充分发挥。例如,干旱严重的1978年,某
The National Water Management Conference held in May 1981 decided to shift the focus of water management to management. The first is to strengthen the management of existing projects. Thirty-two years since the founding of the PRC, a large number of water conservancy projects have been set up in the Fuzhou area, with effective irrigated area reaching 78% of the total cultivated area. From the county to the commune have formed their own storage, cited, mention irrigation system. However, as many projects are eager to build upon their construction. Ignoring the quality and relaxing the support. When applying, it does not attach importance to technical management and does not pay attention to the actual results, resulting in that the reservoir can not store water according to the design, and some channels are seriously clogged so that the project benefits can not be fully utilized. For example, a serious drought in 1978, a