高水头水利枢纽在建设期间,需向下游排水,因此,水库运行将具有不同水位和通过多层排水。如果水利枢纽设有土坝工程,则每层排水需设泄洪隧洞,以排泄水库拦蓄的正常拥水位以下的库容的弃水,同样亦可渲泄上一层的弃水。多层的泄水隧洞的出流可以采取集中纳入一条隧洞(如切罗契依斯奇水利枢纽),或每层各自有单独的尾水渠(图1)。多层的泄水隧洞的出口段均集中一条竖井代替尾水出流,可以缩短隧洞的总长度。但是
During the construction of the high-head hydraulic complex, drainage should be carried out downstream. Therefore, the reservoir operation will have different water levels and pass multiple drainage. If there is an earth dam project in the water control project, flood discharge tunnels should be set for each drainage layer to drain the reservoir of water below the normal water level reserved by the reservoir and to also release the water from the previous stage. The outflow of multi-layered drainage tunnels can be centralized into a single tunnel (eg, the Cherchi Isis Hydropower Complex), or separate drains on each floor (Figure 1). The outlet of multi-layered drainage tunnels all concentrate one shaft instead of the tail water to reduce the overall length of the tunnel. but