由中国企业建设、连接埃塞俄比亚和吉布提两国首都的亚的斯亚贝巴-吉布提铁路(亚吉铁路)于2016年10月5日通车。在亚吉铁路中,中铁二局承建了亚的斯亚贝巴(SEBETA)-MIESO段新建标准轨铁路的建设,笔者在该项目中主要负责设备的管、用、养、修等工作。这个项目的施工设备基本上都是从国内采购,整个项目施工设备总计为1042台(套),下面从设备配置与管理以及海外工程项目设备的使用与维护的角度谈一些体会。
Opened in October 5, 2016, the Addis Ababa-Djibouti Railway (Aji-Ji Railway), built by Chinese enterprises connecting the capitals of Ethiopia and Djibouti, opened to traffic. In the Asia-Kyrgyzstan Railway, China Railway 2 Bureau of Construction of Addis Ababa (SEBETA) -MIESO section of the new standard railroad construction, the author in this project is mainly responsible for equipment management, use, maintenance and repair work. The project construction equipment are basically purchased from the country, the entire project a total of 1042 sets of construction equipment (sets), the following equipment configuration and management and overseas project equipment use and maintenance point of view talk about some experience.