2011年,《中国示范快堆电站总技术方案和初步可行性研究》项目的各项工作稳步推进,基本完成了任务书中本年度的计划目标,取得重要成果:预先设计研究合同执行完毕,完成合同对俄的形式验收;组织多轮对俄技术磋商,对技术设计合同进行了充分讨论,除个别遗留问题外,其他问
In 2011, the work of “Overall Technical Proposal and Preliminary Feasibility Study of China’s Model Fast Reactor Power Station” was steadily progressed. The planned objectives for the current year in the mission statement were basically achieved and important results were achieved: the pre-designed research contract was completed and the contract was completed Russia’s formal inspection and acceptance of the situation; organized a number of rounds of technical consultations with Russia, and fully discussed the technical design contract. Except for a few remaining issues, other questions