摘要:由于钢结构本身具备自重轻、强度高、施工快等独特优点,因此对高层、大跨度,尤其是超高层、超大跨度,采用钢结构更是非常理想。轻型金属板材及其配套的门式刚架等系列轻型钢结构已得到了较为广泛的应用,自《门式刚架轻型房屋钢结构技术规程》(CECS 102:98)公布已来,此类工程有了更快的发展,但也陆续听到一些令人不安的情况。去年雨水较大,降雪较多,有些地方雪特别大,结构被压坏恐怕很难避免,但有的地方雪不大房子也有垮的,漏水的更多。另外,也看到一些工程,有的框架梁太细,令人担心,遇到大雪很可能出问题。有的骨架立起来摇摇晃晃,没有支撑,说装上墙板就好了,好象有了墙板就可以不要支撑。现在排架多起来,用钢筋砼柱、轻钢梁,造价较低,但有的严重不合规定。以下就轻钢结构设计及施工谈自己的几点体会。 关键词:门式刚架, 钢结构
中图分类号:TU318文献标识码:A文章编号:
Abstract: as the steel structure itself has light weight, high strength, construction as well as fast unique advantages, so to top, big span, especially tall, big span, the steel structure is very ideal. Light sheet metal and its complete door frame of series of light steel structure has been a wide range of applications, from the door frame of light steel structure housing technical regulations (CECS 102:98) published has come, this kind of the project has a faster development, but also have heard some disturbing. Last year the rain is bigger, more snow, where some snow particularly large, crushed structure: I'm afraid it is difficult to avoid, but some local snow house also have the little pieces, leaking more. In addition, also see some engineering, some LiangTaiXi framework, worrying, meet the snow is likely a problem. Some skeleton stand wobbled, and no support, said mount wallboard, seems to have the wallboard can don't support. Now more than bent up, with reinforced concrete column, light steel beam, the cost is low, but some serious illegal. The following is light steel structure design and construction about his some comments.
Key words: the door frame, steel structure
一、設计方面
1.屋面活荷载取值
《钢结构设计规范》规定不上人屋面的活荷载为0.5kN/m2,但构件的荷载面积大于60m2的可乘折减系数0.6。门式刚架一般符合此条件,所以可用0.3kN/m2,与钢结构设计规范保持一致。国外这类,要考虑0.15-0.5N/m2的附加荷载,而我们无此规定,遇到超载情况,就要出安全问题。建议设计时可适当提高至0.5kN/m2(可以考虑为使用附加荷载)。
2. 刚架计算的应力比取值问题
这就是专业公司设计钢屋架很经济的原因,应力比贴着上限跑(接近1.0)。未给突发事件留有足够的空间,这就是近几年轻钢厂房频频出现事故的因素之一。建议设计者在应力比取值上限不要超过0.8。
3.檩条的计算
檩条计算问题较大。檩要是冷弯薄壁构件,受压板件或压弯板件的宽厚比大,在受力时要屈曲,强度计算应采用有效宽度,对原有截面要减弱,不能象热轧型钢那样全截面有效。有效宽度理论是在《冷弯薄壁型钢构件技术规范》(GB50018-2002)中讲的,有的设计人员恐怕还不了解,甚至有些设计软件也未考虑。但是,设计光靠软件不行,还要能判断。软件未考虑的,自己要考虑。再有,设计人员往往忽略强度计算要用净断面,忽略钉孔减弱。这种减弱,一般达到6-15%,对小截面窄翼缘的梁影响较大。刚架整体分析采用的是全截面,如果强度计算不用净截面,实际应力将高于计算值。《规范》4.1.8、9条规定:“结构构件的受拉强度应按净截面计算;受压强度应按有效截面计算;稳定性应按有效截面计算。变形和各种稳定系数均可按毛截面计算”。
施工方面
柱脚的破坏
1.1 预埋地脚螺栓与砼短柱边距离过近。在刚架吊装时,经常不可避免的会人为产生一些侧向外力,而将柱顶部砼拉碎或拉崩。在预埋螺栓时,钢柱侧边螺栓不能过于靠边,应与柱边留有足够的距离。同时,砼短柱要保证达到设计强度后,方可组织刚架的吊装工作。
1.2 往往容易遗忘抗剪槽的留设和抗剪件的设置。柱脚锚栓按承受拉力设计,计算时不考虑锚栓承受水平力。若未设置抗剪件,所有由侧向风荷载、水平地震荷载、吊车水平荷载等产生的柱底剪力,几乎都有柱脚锚栓承担,从而破坏柱脚锚栓。
1.3 柱脚底板与砼柱间空隙过小,使得灌浆料难以填入或填实。一般二次灌料空隙为50mm。
1.4 有些工程地脚螺栓位置不准确,为了方便刚架吊装就位,在现场对底板进行二次打孔,任意切割,造成柱脚底板开孔过大,使得柱脚固定不牢,锚栓最小边(端)距亦不能满足规范要求。
2.柱子拔出
有的刚架在大风时柱子被拔起,这是实际中常出现的事故。主要原因不是刚架计算失误,而且设计柱间支撑时,未考虑支撑传给柱脚的拉力。尤其是房屋纵向尺度较小时,只设置少量柱间支撑来抵抗纵向风荷载,支撑传给柱脚的拉力很大,而柱脚又没有采取可靠的抗拔措施,很可能将柱子拔起。,因此,在风荷载较大的地区刚架柱受拉时,在柱脚应考虑抗拔构造,例如锚栓端部设锚板等。
2.没有柱间支撑
有些业主为了不影响使用,擅自叫施工方拆除柱间支撑。这种情况最近较多,这样肯定不行。目前没有任何一本规范允许不设支撑。特别是柱间支撑,受力较大,绝不能省略。
3. 梁、柱连接与安装
3.1 多跨门式刚架中柱按摇摆柱设计,而实际工程却把中柱与斜梁焊死,致使实际构造与设计计算简图不符,造成工程事故。所以,安装要严格按照设计图纸施作;
3.2 翼缘板与加厚或加宽连接板对接焊缝时,未按要求做成倾斜度的过渡。对接焊缝连接处,若焊件的宽度或厚度不同,且在同一侧相差4mm以上者,应分别在宽度或厚度方向从一侧或两侧做成坡度不大于1:2.5(1:4)的斜角。
3.3 端板连接面制作粗燥,切割不平整,或与梁柱翼缘板焊接时控制不当,使端板翘曲变形,造成端板间接触面不吻合,连接螺栓不得力,从而满足不了该节点抗弯受拉、抗剪等结构性能。
3.4 刚架梁柱拼接时,把翼缘板和腹板的拼接接头放在同一截面上,造成工程隐患。拼接接头时,翼缘板和腹板的接头一定要按规定错开。
3.5 刚架梁柱构件受集中荷载处未设置对应的加劲肋,容易造成结构构件局部受压失稳。
3.6 连接高强螺栓不符合《钢结构用扭剪型高强度螺栓连接的技术条件》或《钢结构用高强度大六角头螺栓、大六角头螺母、垫圈型式尺寸与技术条件》的相关规定。高强螺栓拧紧分初拧、终拧,对大型节点还应增加复拧。拧紧应在同一天完成,切勿遗忘终拧。一定要在结构安装完成后,对所有的连接螺栓应逐一检查,以防漏拧或松动。
3.7 有些工程中高强螺栓连接面未按设计图纸要求进行处理,使得抗滑移系数不能满足该节点处抗剪要求。必须按照设计要求的连接面抗滑移系数去处理
3.8 有的工程缺乏有针对性的吊装方案,吊装刚架时,未采用临时措施保证刚架的侧向稳定,造成刚架安装倒塌事故。应先安装靠近山墙的有柱间支撑的两榀刚架,而后安装其他刚架。头两榀刚架安装完毕后,应在两榀刚架间将水平系杆,檩条及柱间支撑,屋面水平支撑,隅撑全部装好,安装完成后应利用柱间支撑及屋面水平支撑调整构件的垂直度及水平度,待调整正确后方可锁定支撑,而后安装其他刚架。
4. 檩条、支撑等构件的制作安装
4.1 为了安装方便,随意增大、加长檩条或檩托板的螺栓孔径。檩条不仅仅是支撑屋面板或悬挂墙面板的构件,而且也是刚架梁柱隅撑设置的支撑体,设置一定数量的隅撑可减少刚架平面外的计算长度,有效的保证了刚架的平面外整體稳定性。若檩条或檩托板孔径过大过长,隅撑就失去了应有的作用。
4.2 隅撑角钢与钢梁的腹板直接连接,当刚架受侧向力时,使腹板在该处局部受到侧向水平力作用,容易导致钢梁局部侧向失稳。
4.3 有的工程所用檩条仅用电镀,造成工程尚未完工,檩条早已生锈。檩条宜采用热镀锌带钢压制而成的檩条,且保证一定的镀锌量。
4.4 因墙面开设门洞,擅自将柱间垂直支撑一端或两端移位。同一区隔的柱间支撑、屋面水平支撑与刚架形成纵向稳定体系,若随意移动其位置将会破坏其稳定体系。
4.5 有些单位为了节省钢材和人工,将檩条和墙梁用钢板支托的侧向加劲肋取消,这将影响檩条的抗扭刚度和墙梁受力的可靠性。故施工单位不得任意取消设计图纸的一些做法。
4.6 有的单位擅自增加屋面荷载,原设计未考虑吊顶或设备管道等悬挂荷载,而施工中却任意增加吊顶等悬挂荷载,从而导致钢梁挠度过大或坍塌。任何单位均不得擅自增加设计范围以外的荷载。
4.7 屋面板未按要求设置,将固定式改为浮动式,使檩条侧向失稳。往往设计檩条时,会考虑屋面压型钢板与冷弯型钢檩条牢固连接,能可靠的阻止檩条侧向失稳并起到整体蒙皮作用。
4.8 刚性系杆、风拉杆的连接板设置位置高低不一,使得水平支撑体系不在同一平面上,从而影响刚架的整体稳定性。刚性系杆与风拉杆构成水平支撑体系,其设置高度在同一坡度方向应保持一致。
5.屋面漏水现场
5.1加强施工人员的施工技能训练,打钉时要稳、要准,尽量不要打偏。出现打偏时要及时补上硅酮密封胶(不要施用玻璃胶)
5.2水槽问题很重要,目前在广东地区由于成本低廉的因素大量使用彩钢板水槽。由于基材薄,酸雨多。水槽不平整大量存水等因素的影响,彩钢板水槽的使用寿命最长就5年。而且更换水槽工序繁琐,所以建议使用不锈钢水槽,达到一劳永逸的效果。
以上几点是在轻钢结构设计及施工中发现问题总结而得,有些问题虽然很微小,但往往成败就在这些微不足道的细节处理上,希望各位同行能重视这些问题,发现问题,共同交流一起共勉。
参考文献:
[1]高光虎,多高层轻型钢结构住宅设计,建筑结构,2001
[2]包头钢铁设计研究总院,钢结构设计与计算(第2版),2006
[3]轻钢结构施工与监理手册,2003
[4]中华人民共和国国家标准《钢结构设计规范》(GBJ17-88),北京
中图分类号:TU318文献标识码:A文章编号:
Abstract: as the steel structure itself has light weight, high strength, construction as well as fast unique advantages, so to top, big span, especially tall, big span, the steel structure is very ideal. Light sheet metal and its complete door frame of series of light steel structure has been a wide range of applications, from the door frame of light steel structure housing technical regulations (CECS 102:98) published has come, this kind of the project has a faster development, but also have heard some disturbing. Last year the rain is bigger, more snow, where some snow particularly large, crushed structure: I'm afraid it is difficult to avoid, but some local snow house also have the little pieces, leaking more. In addition, also see some engineering, some LiangTaiXi framework, worrying, meet the snow is likely a problem. Some skeleton stand wobbled, and no support, said mount wallboard, seems to have the wallboard can don't support. Now more than bent up, with reinforced concrete column, light steel beam, the cost is low, but some serious illegal. The following is light steel structure design and construction about his some comments.
Key words: the door frame, steel structure
一、設计方面
1.屋面活荷载取值
《钢结构设计规范》规定不上人屋面的活荷载为0.5kN/m2,但构件的荷载面积大于60m2的可乘折减系数0.6。门式刚架一般符合此条件,所以可用0.3kN/m2,与钢结构设计规范保持一致。国外这类,要考虑0.15-0.5N/m2的附加荷载,而我们无此规定,遇到超载情况,就要出安全问题。建议设计时可适当提高至0.5kN/m2(可以考虑为使用附加荷载)。
2. 刚架计算的应力比取值问题
这就是专业公司设计钢屋架很经济的原因,应力比贴着上限跑(接近1.0)。未给突发事件留有足够的空间,这就是近几年轻钢厂房频频出现事故的因素之一。建议设计者在应力比取值上限不要超过0.8。
3.檩条的计算
檩条计算问题较大。檩要是冷弯薄壁构件,受压板件或压弯板件的宽厚比大,在受力时要屈曲,强度计算应采用有效宽度,对原有截面要减弱,不能象热轧型钢那样全截面有效。有效宽度理论是在《冷弯薄壁型钢构件技术规范》(GB50018-2002)中讲的,有的设计人员恐怕还不了解,甚至有些设计软件也未考虑。但是,设计光靠软件不行,还要能判断。软件未考虑的,自己要考虑。再有,设计人员往往忽略强度计算要用净断面,忽略钉孔减弱。这种减弱,一般达到6-15%,对小截面窄翼缘的梁影响较大。刚架整体分析采用的是全截面,如果强度计算不用净截面,实际应力将高于计算值。《规范》4.1.8、9条规定:“结构构件的受拉强度应按净截面计算;受压强度应按有效截面计算;稳定性应按有效截面计算。变形和各种稳定系数均可按毛截面计算”。
施工方面
柱脚的破坏
1.1 预埋地脚螺栓与砼短柱边距离过近。在刚架吊装时,经常不可避免的会人为产生一些侧向外力,而将柱顶部砼拉碎或拉崩。在预埋螺栓时,钢柱侧边螺栓不能过于靠边,应与柱边留有足够的距离。同时,砼短柱要保证达到设计强度后,方可组织刚架的吊装工作。
1.2 往往容易遗忘抗剪槽的留设和抗剪件的设置。柱脚锚栓按承受拉力设计,计算时不考虑锚栓承受水平力。若未设置抗剪件,所有由侧向风荷载、水平地震荷载、吊车水平荷载等产生的柱底剪力,几乎都有柱脚锚栓承担,从而破坏柱脚锚栓。
1.3 柱脚底板与砼柱间空隙过小,使得灌浆料难以填入或填实。一般二次灌料空隙为50mm。
1.4 有些工程地脚螺栓位置不准确,为了方便刚架吊装就位,在现场对底板进行二次打孔,任意切割,造成柱脚底板开孔过大,使得柱脚固定不牢,锚栓最小边(端)距亦不能满足规范要求。
2.柱子拔出
有的刚架在大风时柱子被拔起,这是实际中常出现的事故。主要原因不是刚架计算失误,而且设计柱间支撑时,未考虑支撑传给柱脚的拉力。尤其是房屋纵向尺度较小时,只设置少量柱间支撑来抵抗纵向风荷载,支撑传给柱脚的拉力很大,而柱脚又没有采取可靠的抗拔措施,很可能将柱子拔起。,因此,在风荷载较大的地区刚架柱受拉时,在柱脚应考虑抗拔构造,例如锚栓端部设锚板等。
2.没有柱间支撑
有些业主为了不影响使用,擅自叫施工方拆除柱间支撑。这种情况最近较多,这样肯定不行。目前没有任何一本规范允许不设支撑。特别是柱间支撑,受力较大,绝不能省略。
3. 梁、柱连接与安装
3.1 多跨门式刚架中柱按摇摆柱设计,而实际工程却把中柱与斜梁焊死,致使实际构造与设计计算简图不符,造成工程事故。所以,安装要严格按照设计图纸施作;
3.2 翼缘板与加厚或加宽连接板对接焊缝时,未按要求做成倾斜度的过渡。对接焊缝连接处,若焊件的宽度或厚度不同,且在同一侧相差4mm以上者,应分别在宽度或厚度方向从一侧或两侧做成坡度不大于1:2.5(1:4)的斜角。
3.3 端板连接面制作粗燥,切割不平整,或与梁柱翼缘板焊接时控制不当,使端板翘曲变形,造成端板间接触面不吻合,连接螺栓不得力,从而满足不了该节点抗弯受拉、抗剪等结构性能。
3.4 刚架梁柱拼接时,把翼缘板和腹板的拼接接头放在同一截面上,造成工程隐患。拼接接头时,翼缘板和腹板的接头一定要按规定错开。
3.5 刚架梁柱构件受集中荷载处未设置对应的加劲肋,容易造成结构构件局部受压失稳。
3.6 连接高强螺栓不符合《钢结构用扭剪型高强度螺栓连接的技术条件》或《钢结构用高强度大六角头螺栓、大六角头螺母、垫圈型式尺寸与技术条件》的相关规定。高强螺栓拧紧分初拧、终拧,对大型节点还应增加复拧。拧紧应在同一天完成,切勿遗忘终拧。一定要在结构安装完成后,对所有的连接螺栓应逐一检查,以防漏拧或松动。
3.7 有些工程中高强螺栓连接面未按设计图纸要求进行处理,使得抗滑移系数不能满足该节点处抗剪要求。必须按照设计要求的连接面抗滑移系数去处理
3.8 有的工程缺乏有针对性的吊装方案,吊装刚架时,未采用临时措施保证刚架的侧向稳定,造成刚架安装倒塌事故。应先安装靠近山墙的有柱间支撑的两榀刚架,而后安装其他刚架。头两榀刚架安装完毕后,应在两榀刚架间将水平系杆,檩条及柱间支撑,屋面水平支撑,隅撑全部装好,安装完成后应利用柱间支撑及屋面水平支撑调整构件的垂直度及水平度,待调整正确后方可锁定支撑,而后安装其他刚架。
4. 檩条、支撑等构件的制作安装
4.1 为了安装方便,随意增大、加长檩条或檩托板的螺栓孔径。檩条不仅仅是支撑屋面板或悬挂墙面板的构件,而且也是刚架梁柱隅撑设置的支撑体,设置一定数量的隅撑可减少刚架平面外的计算长度,有效的保证了刚架的平面外整體稳定性。若檩条或檩托板孔径过大过长,隅撑就失去了应有的作用。
4.2 隅撑角钢与钢梁的腹板直接连接,当刚架受侧向力时,使腹板在该处局部受到侧向水平力作用,容易导致钢梁局部侧向失稳。
4.3 有的工程所用檩条仅用电镀,造成工程尚未完工,檩条早已生锈。檩条宜采用热镀锌带钢压制而成的檩条,且保证一定的镀锌量。
4.4 因墙面开设门洞,擅自将柱间垂直支撑一端或两端移位。同一区隔的柱间支撑、屋面水平支撑与刚架形成纵向稳定体系,若随意移动其位置将会破坏其稳定体系。
4.5 有些单位为了节省钢材和人工,将檩条和墙梁用钢板支托的侧向加劲肋取消,这将影响檩条的抗扭刚度和墙梁受力的可靠性。故施工单位不得任意取消设计图纸的一些做法。
4.6 有的单位擅自增加屋面荷载,原设计未考虑吊顶或设备管道等悬挂荷载,而施工中却任意增加吊顶等悬挂荷载,从而导致钢梁挠度过大或坍塌。任何单位均不得擅自增加设计范围以外的荷载。
4.7 屋面板未按要求设置,将固定式改为浮动式,使檩条侧向失稳。往往设计檩条时,会考虑屋面压型钢板与冷弯型钢檩条牢固连接,能可靠的阻止檩条侧向失稳并起到整体蒙皮作用。
4.8 刚性系杆、风拉杆的连接板设置位置高低不一,使得水平支撑体系不在同一平面上,从而影响刚架的整体稳定性。刚性系杆与风拉杆构成水平支撑体系,其设置高度在同一坡度方向应保持一致。
5.屋面漏水现场
5.1加强施工人员的施工技能训练,打钉时要稳、要准,尽量不要打偏。出现打偏时要及时补上硅酮密封胶(不要施用玻璃胶)
5.2水槽问题很重要,目前在广东地区由于成本低廉的因素大量使用彩钢板水槽。由于基材薄,酸雨多。水槽不平整大量存水等因素的影响,彩钢板水槽的使用寿命最长就5年。而且更换水槽工序繁琐,所以建议使用不锈钢水槽,达到一劳永逸的效果。
以上几点是在轻钢结构设计及施工中发现问题总结而得,有些问题虽然很微小,但往往成败就在这些微不足道的细节处理上,希望各位同行能重视这些问题,发现问题,共同交流一起共勉。