本文主要介绍了丹东港粮食2#、3#泊位工程先张法施工的主要设备及施工技术控制要点,详细阐述了钢筋冷拉、张拉具体操作,以工程实践为佐证,将此工艺技术加以推广。
This article mainly introduces the main equipment and construction technology control points of the first prefabricated construction of 2 # and 3 # berths for food in Dandong Port, and elaborates the concrete operation of cold drawing and tensioning of steel bars in detail. This project is supported by engineering practice Promotion.