论文部分内容阅读
我厂2台5吨桥式吊车,大车及小车行走轮上安装有MZD1—200型电磁铁的制动器各3台,2台吊车共计6台;升降钢丝绳2个卷扬筒上安装有MZS1—300型电磁铁的制动器各2台,2台吊车共计4台制动器。在吊车使用过程中,时常烧坏制动器线圈,有时一个台班(8小时?
I plant 2 sets of 5 tons of bridge cranes, carts and trolleys on the MZD1-200 electromagnet installed on the brake each 3, 2 cranes a total of 6 sets; lift rope 2 winch tube installed MZS1- Two 300-type electromagnet brakes, two cranes a total of four brakes. In the process of using the crane, often burn the brake coil, and sometimes a station class (8 hours?