喀群引水枢纽东岸总干渠担负着喀什地区叶城县,泽普县,泽普石油基地,莎车县河东乡镇等150万亩地的灌溉任务和泽普县总装机容量位3万3千千瓦的两座电站的供水问题,因各种原因渠道首段的东岸进水闸闸后的消力池和末端的东岸进水冲砂闸闸前(人工弯道段及以下部分)年年产生大量的淤积,影响正常引水并需要大量人工和物资,下面简单分析有关问题并谈起解决的简单方法.
The main trunk canal of the east bank of the Qiaquanyu diversion project is responsible for the irrigation tasks of 150 million mu of land in Yecheng County, Zepu County, Zepu Oilfield in Kashi Prefecture, Hedong Township in Shache County, and Zapu County with a total installed capacity of 33,000 Kilowatt two power station water supply problems, due to various reasons the first paragraph of the Channel after the East Coast sluice behind the pool and the end of the East Coast flood flushing sluice gate (artificial corners and the following section) years Resulting in a lot of siltation, affecting the normal water diversion and the need for a lot of labor and supplies, the following simple analysis of the problem and talk about the solution to the simple method.