论文部分内容阅读
1987年9月7日至9日,水电部规划院工作组在成都对在建铜街子水电站进行了设计复查。会议认为,我院对设计复查是重视的,态度积极认真,工作也比较深入,基本满足了设计复查的要求。铜街子水电站基建程序完备,设计指导思想正确,建设规模、设计标准和枢纽布置等均符合国家现行规范和规定。会议通过对溢流坝段基础处理方案、木材过坝方案、节约水泥的技术措施、设临时过渡
From September 7 to September 9, 1987, the Planning Department of the Ministry of Electricity and Water Resources Planning Department conducted a design review of the construction of the Tongjiaozi Hydropower Station in Chengdu. The meeting held that our hospital is the design review is valued, positive and serious attitude, work is also more in-depth, basically meet the design review requirements. Tongjizi hydropower station infrastructure program is complete, the design guiding ideology, construction scale, design standards and hub layout are in line with existing national norms and regulations. Meeting through the overflow dam section of the basic treatment programs, wood dam project, cement saving technical measures, set temporary transition