【摘 要】
:
《林业建设》是国家林业局主管,由中国林业工程建设协会、国家林业局昆明勘察设计院共同主办、经国家科委批准向国内外公开发行的科技刊物,同时它是林业工程建设标准局部修订
论文部分内容阅读
《林业建设》是国家林业局主管,由中国林业工程建设协会、国家林业局昆明勘察设计院共同主办、经国家科委批准向国内外公开发行的科技刊物,同时它是林业工程建设标准局部修订公告刊物,也是中国工程建设协会及其会员单位信息交流的窗口。本刊办刊宗旨是交流林业工程建设信息,培养林业工程建设队伍,服务林业工程建设管理,推动
“Forestry Construction” is the director of the State Forestry Administration, co-sponsored by China Forestry Engineering Construction Association and Kunming Investigation and Design Institute under the State Forestry Administration and approved by the State Science and Technology Commission for public issue of science and technology publications at home and abroad. At the same time, it is a partial revision of the standards for the construction of forestry projects Bulletin publications, but also the China Construction Association and its member information exchange window. Our aim is to exchange information on forestry project construction, training of forestry construction team, construction and management of forestry services to promote
其他文献
Bottom-emitting organic light-emitting diodes(BOLEDs),using Al/MoO_3 as the semitransparent anode and LiF/Al as tie reflective cathode and Alq_3 as the emitter,
We consider intrinsic gate capacitance variations due to random dopants in the nanometer metal oxide semiconductor field effect transistor(MOSFET) channel.The v
为扭转江垭枢纽引水发电系统施工初期严重滞后的被动局面 ,业主充分发挥工程建设的主导作用 ,合理调整施工进度计划 ,以关键路径为导向 ,制定切实可行的阶段目标 ,实行目标管
近20年来,考古工作者在固原发掘不少汉代墓葬,出土了大量的随葬品,由此可看到汉墓在固原的分布规律、丧葬习俗、墓主身份、墓葬形制、随葬器物等,从而反映出汉代高平在高度统
1962年2月21日,河北日报刊登了塞罕坝机械林场建场的消息。从那时起到现在,我们对塞罕坝的关注已经55年了。半个多世纪里,新闻里的塞罕坝,常写常新,总有写不完的故事。门振成
安溪县位于闽南金三角开放区结合部,是驰名中外的乌龙茶“铁观音”故乡。1996至1999年安溪县连续四年被评为“福建省经济发展十佳县”。随着茶都建设日臻完善,创新了茶文化
Nucleotide diversity(π) and linkage disequilibrium(LD) analysis based on SNP marker could provide a sound basis for choosing an association analysis method.Jap
The Kuramoto model for an ensemble of coupled oscillators provides a paradigmatic example of non-equilibrium transitions between an incoherent and a synchronize
We report Al_(0.30)Ga_(0.70)N/GaN/Al_(0.07)Ga_(0.93)N double heterostructure high electron mobility transistors with a record saturation drain current of 1050 m
本文结合二滩电站水轮发电机定、转子结构特点,简单介绍了定、转子的安装。
In this paper, Ertan hydropower station generator stator and rotor structure characterist