针对复杂随机活动网络活动时间、费用随机性和相关性特点,采用蒙特卡罗方法随机抽取时间、费用样本,再利用乔列斯基因子分解法,将独立分布的时间和费用随机样本转化为相关的随机样本,建立了时间和费用为相关随机变量的随机活动网络仿真模型.通过算例结果的比较分析,说明新模型可以更准确地预测项目的风险概率,进行时间-费用交换分析以及进行项目工期和费用优化.
其他文献
The influence of each factor on the reaction of geopolymers material was investigated by using the orthogonal experimental design method, which got the optimal
The turn-key construction project is implemented in Taiwan not by a single company but by a make-shift group of several companies-Hence,problems to coordinate t
Studies show that supply chain cooperation improves supply chain performance. However, it remains a challenge to develop and implement the realistic supply chai
This paper presents a fault diagnosis method for process faults and sensor faults in a class of nonlinear uncertain systems. The fault detection and isolation a
针对离散GM(1,1)模型在参数辩识过程是否出现病态问题,利用矩阵条件数进行了研究,研究结果表明:直接用原始数据建模,模型会出现很大的病态问题,问题的严重性很大程度上与原始
为探究吕家坨井田地质构造格局,根据钻孔勘探资料,采用分形理论和趋势面分析方法,研究了井田7
针对传统数据包络分析的排序主要是基于决策单元的自评效率,决策单元使用的是对自身最有利的权重而使效率不具有可比性,提出一种新的决策单元排序方法.该方法通过构造有利于
应用灰色系统建模方法及新信息原理,在GM(1,1)建模思想的基础上提出了一种基于直接建模的逐步优化的新息非等间距GM(1,1)模型,该模型采用原始数据的第n个分量作为灰色微分方
研究系统的全寿命经济分析问题.该系统既有可修故障,也有不可修故障,在综合考虑系统全寿命中的收益、建造费用、检测费用、修理费用和善后费用等各项费用的条件下,利用概率分
为解决不确定环境下决策成员具有有限理性行为特征的两层决策问题,基于概率权重具有稳定性和结果价值具有模糊性两项合理假设命题,从平衡上下两层满意度视角提出了用于确定最