双曲拱坝优化设计中的几个问题

来源 :计算结构力学及其应用 | 被引量 : 0次 | 上传用户:chengmoshijing
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
本文在早先工作的基础上,进一步研究了双曲拱坝的优化设计问题,给出了五心圆双曲拱坝和抛物线双曲拱坝的几何模型,离散几何模型和混合几何模型,对各种拱坝几何模型的特点进行了分析和评述,提出了通过设计变量的缩减而得到几种不同几何模型的方法,给出了两阶段优化方法和边界搜索法,在我国,双曲拱坝的优化设计已开始应用于实际工程,效果显著。本文介绍了为使拱坝优化设计进入实用阶段而采取的一些策略。 Based on the previous work, this paper further studied the optimization design problem of double-curvature arch dams, and presented the geometric models, discrete geometric models and mixed geometric models of the five-center circular double curved arch dam and the parabolic double curved arch dam. The characteristics of arch dam geometric models were analyzed and reviewed. Several methods for different geometric models were proposed through the reduction of design variables. Two-stage optimization methods and boundary search methods were presented. In China, double curved arch dams Optimized design has begun to be applied to practical projects with significant results. This article describes some of the strategies that have been taken to get the optimal design of arch dams into practical use.
其他文献
一、概况云南省建五公司预制厂于1980年2月建成用手势控制的混凝土自动搅拌站。该站土建以外的部分由云南省建筑科研所自行构思和设计,经二年多时间的使用,效果良好。搅拌站
实现建筑工业化,就要搞好设计标准化、构配件生产工厂化和施工机械化。而统一建筑模数和参数是“三化”的技术基础。近廿多年来,建筑模数的研究在许多国家得到了发展,并且进
基坑开挖、人工降水、地面堆载,桩的设置等因素往往使地基发生横向变形,在软土地基尤烈。结果引起邻近设备基础、桩基以及建筑物发生侧移。我国对沉降测试已积累多年的经验,
问答题是物理题中一个极其重要的组成部分,通过对物理问答题的练习,不仅能加深和巩固对物理概念和物理规律的理解,进而培养学生运用物理知识解决实际问题的能力,而且能有效地
历史如风,硝烟散尽。1935年10月19日,中共中央率领中央红军经过二万五千里长征,到达陕北吴起镇,进入西北苏区,从而胜利地结束了中央红军的长征。吴起镇革命旧址包括毛泽东旧
基本振型的自振周期是经常用来说明框架的动力特性的。框架的基本自振周期值可以从有关资料的振动方程式直接计算出来。然而在实际的设计工作中,精确的分析须耗费很多的时间
解放后在短短的七年期间,我们国家的社会主义建设在建筑设计方面是有很大成就的。首先全国各地很快就把反动派遗留下来的满目疮伤整理清楚,恢复正常;跟着就开始了建设工作。
改革开放以来,中国社会、经济、科技的快速发展,极大地影响着当代的教育,而教育也为这一发展作出了不可替代的贡献。可以说,没有教育的改革与发展也就没有今天中国的繁荣。中
中国饮茶历史非常悠久,各民族“客来敬茶、以茶待客、以茶会友”的风尚日益盛行并不断赋予新的内涵,茶已成为名副其实的“国饮”;由此形成的中华茶文化几乎贯穿了中华民族五
安徽省宿州市砀山县砀城第一小学老校区刘星语我想发明一种神奇指环,它上面有两个按钮。当你需要拿一样东西的时候,只要按下白色按钮,这个指环会发出一种电磁波把你想要的东