论文部分内容阅读
本文根据大连市地铁一期工程湾家站围护结构施工图,简要说明了湾家车站明挖深基坑工程监测项目及频率、监测测点布置、监控量测数据处理及信息反馈、监测管理体系和注意事项。对地铁施工监测有参考价值。
Based on the construction drawings of the retaining structure of Wanjia Station of Dalian Metro Phase I project, this paper briefly describes the monitoring project and the frequency, the layout of monitoring points, the monitoring and measuring data processing and information feedback, the monitoring and management System and precautions. The subway construction monitoring has reference value.