后箐水库工程设计阶段,结合工程特性和相关设计规范,对施工导流、大坝工程基础开挖、基础处理、混凝土浇筑等关键内容进行了深入分析。根据工程规模特性,结合导流标准提出了合理的施工导流方式、导流时段和汛期过流方式。并从基础开挖、基础处理和混凝土浇筑等方面,对大坝工程的施工组织进行了详细研究,确保大坝施工组织具有较高的科学合理性和技术经济效益。
After the design phase of Houli Reservoir, combining with the engineering characteristics and relevant design specifications, the key contents of construction diversion, dam foundation excavation, foundation treatment and concrete pouring are analyzed in depth. According to the characteristics of the scale of the project, a reasonable construction diversion method, diversion period and flood season overcurrent mode are put forward according to diversion standards. The construction organization of the dam project has been studied in detail from the aspects of foundation excavation, foundation treatment and concrete pouring to ensure that the dam construction organization has high scientific rationality and technical and economic benefits.