论文部分内容阅读
随着大量火电厂的兴建和电厂容量的不断增加,厂区占地面积不断扩大,在厂址选择、节约用地、地基处理、交通运输、确定厂址标高等方面的难度越来越大,对总图设计的要求越来越高。在即将进入21世纪之际,应不断总结经验和提高总图设计技术水平,重视核电厂总图设计的特殊性,充分发挥总图设计对控制造价的作用。
With the construction of a large number of thermal power plants and the continuous increase in the capacity of power plants, the area of the plant area has been continuously expanding, and the difficulty in terms of site selection, land saving, foundation treatment, transportation, and the determination of site elevations has become more and more severe. The demands are getting higher and higher. At the moment of entering the 21st century, it is necessary to continuously sum up experience and improve the technical level of the general plan design, pay attention to the particularity of the general plan design of nuclear power plants, and give full play to the role of general plan design in controlling the construction cost.