论文部分内容阅读
通过对某高层住宅楼的改造加固设计与施工,对停缓建项目为适应新的使用功能需要进行的主体结构改造,采用了加固原有框架柱剪力墙和新增设剪力墙的方式,对同类工程有一定的参考价值。
Through the design and construction of the remodeling and reinforcement of a high-rise residential building, the main structural remodeling of the suspended construction projects to meet the needs of new functional use was adopted, with the reinforcement of the existing frame column shear wall and the addition of a new shear wall , For similar projects have a certain reference value.