论文部分内容阅读
首先介绍了动态施工力学的基本概念和原理,在此基础上简单介绍了运用动态规划优化地下洞室群施工方案,随后运用具体实例分析,发现优化施工顺序能够有效提高围岩稳定效果,这对地下洞室群施工具有重要的参考价值。
First introduced the basic concepts and principles of dynamic construction mechanics, based on this simple introduction of the use of dynamic programming to optimize the construction program of underground caverns, then the use of specific examples of analysis and found that optimizing the construction sequence can effectively improve the stability of surrounding rock, which pairs Underground cavern construction has important reference value.