神木北站2号点式住宅楼建筑面积为1686米~2,造价为104万元,7层砖混结构,抗震按6度设防,所有现浇混凝土均采用C20。该工程经招投标由内蒙古安装公司综合分公司承建,1995年8月10日开工,至1996年5月27日因施工质量低劣被勒令停工,共完成5层主体工程。煤炭工业部神府东胜矿区质监站于1996年5月21日至6月17日对该工程进行了4次现场质量检查。检
The Shenmu North Station No.2 point residential building has a building area of 1,686m~2, a construction cost of 1,040,000 yuan, a 7-storey brick-concrete structure, and a 6-degree fortification for earthquake resistance. All cast-in-place concrete uses C20. The project was tendered and built by the general branch of Inner Mongolia Installation Company. It was started on August 10, 1995 and was ordered to stop due to poor construction quality on May 27, 1996. A total of five layers of main works were completed. The quality supervision station of the Shenfu Dongsheng Mining Area of the Ministry of Coal Industry conducted four on-site quality inspections from May 21 to June 17, 1996. Inspection