世界跨度最大的地下厂房

来源 :中国三峡 | 被引量 : 0次 | 上传用户:l13633332021
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
向家坝水电站厂房分为右岸地下厂房和左岸坝后厂房,其中右岸地下厂房安装四台单机容量800MW的水轮发电机组。向家坝水电站地下厂房是一组大型地下洞室群,包括引水洞、主厂房洞室、主变洞、母线洞、高压电缆竖井、主厂房顶部通风洞、主变(尾闸)交通洞、尾水洞及帷幕廊道和排水廊道等,其中主厂房洞室岩锚梁以下开挖跨度为31.40m,岩锚梁以上开挖跨度为33.40m,洞室高度为85.50m,是目前世界上已建及在建 The Xiangjiaba Hydropower Plant is divided into a right bank underground factory and a left bank dam factory, of which four right-bank underground power plants are installed with four 800MW turbine units. Xiangjiaba Hydropower Station underground powerhouse is a group of large underground caverns, including diversion tunnels, main workshop caverns, main cavern, bus bar holes, high voltage cable shafts, ventilation holes at the top of the main building, main tailgate , Tail water tunnel and curtain corridor and drainage corridor, etc., of which the main plant cave rock anchor beam below the span of 31.40m, Rock Anchor beam above the span of 33.40m, cavern height of 85.50m, is currently The world has built and under construction
其他文献
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
期刊
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
期刊
主持人:rn我2014年1月年满55周岁,正在喀麦隆援外医疗队工作.单位未经我的同意,直接在2014年1月给我办理了退休手续,养老保险费也缴纳至2014年1月.我一直工作到2014年11月结
在海河交汇的咸淡混合之所rn红树林,惟有这天性暧昧之树能站在海口rn——安歌《海口,异乡人之都》rn海南东寨港红树林,在1980年1月经广东省人民政府批准建立了自然保护区,它
低氧性肺动脉高压(HPH)的中心环节是肺血管阻力增加,在低氧早期以肺血管收缩和肺血管重塑为主,随着疾病的进展,可导致右心室肥厚、心力衰竭甚至死亡[1-2].肺动脉平滑肌细胞异
期刊
2019年5月30日,玛莎拉蒂庆祝了8CTF在1939年印第500大赛上的获胜,距离那场胜利已经过去了80年.1939年5月30日,27岁的威尔伯·肖(Warren Wilbur Shaw)驾驶玛莎拉蒂8CTF在一场
期刊
当前,出行方式的便捷、二手车存量的增加、出行需求的下降以及消费心理的改变,均导致年轻人购车需求日益下降.rn可是,反观车企的行为,你便会发现其中的矛盾.不断地有车型以“
期刊
期刊