台湾电力公司新塔电站用煤须从海外进口。有关煤码头建设工程,由省工程顾问公司委托美国梭罗斯公司提出设计方案。后者对煤炭到台后的卸船、贮存和转运系统全面进行了可行性研究,最后推荐方案的要点:13万吨级运煤船从海外将煤运到高雄港内,卸载,堆存,然后用万吨级散货驳转运到新塔。为此,在新塔要相应建设一座离岸卸煤
Taiwan Power Company Tower Power Station coal imports from overseas. The coal terminal construction project commissioned by the provincial engineering consultant company to introduce the United States Thoreau company design. The latter carried out a comprehensive feasibility study on the unloading, storage and trans-shipment systems of coal to Taiwan. The key point of the final recommendation was that 130,000-tonne coal carriers transported coal from overseas to Kaohsiung Harbor for unloading and stockpiling and then With tons of bulk cargo barge transport to the new tower. To this end, in the new tower to build an offshore unloading coal