论文部分内容阅读
20世纪20年代末,绥远持续大旱。1928年秋,省政府决定以工代赈,在有黄河流经的萨拉齐和托克托两县,修筑民生渠。一方面以工代赈,救济广大灾民;另一方面,解决这两县不能利用河水灌溉和黄河经常泛滥的问题。整个工程期间一直存在“人工不敷”的窘境。1931年,主渠道基本完成,由于种种原因,“水不能入”。可以说救灾和防灾的目的均未达到。
In the late 1920s, Suiyuan sustained a severe drought. The autumn of 1928, the provincial government decided to work-for-work, in the Yellow River flows through Sarazi and Tuoketuo counties, building Minsheng drainage. On the one hand, work-for-work was taken to relieve the flood victims; on the other hand, the two counties can not solve the problem of river water irrigation and frequent floods of the Yellow River. The entire project has been there “artificial inadequate ” dilemma. In 1931, the main channel basically completed, due to various reasons, “water can not enter ”. Can be said that the purpose of disaster relief and disaster prevention are not met.