论文部分内容阅读
摘要: 近几年来高层住宅坡屋面的使用越来越多,但由于其与平屋面有较大区别, 实际防水效果不尽如人意,渗漏现象时有发生。结合工程实例,通过模板现场定位,确定支模方法, 了解钢筋构造节点大样,钢筋现场量取下料,确定混凝土浇筑顺序、方式,瓦的细部节点处理,确保坡屋面工程质量。
关键词: 高层住宅;坡屋面;防渗漏;施工技术
中图分类号:TU74文献标识码:A文章编号:
Abstract: in recent years high-rise residential use more and more of the slope roof, but because the flat roof and have great differences, actual waterproof effect not satisfactory, leakage is often happened. Combined with the engineering practice, through the template site positioning, determine the mode branch method, know reinforced structure DaYang node, reinforced the take material quantity, determining concrete pouring order, mode, the details of the node processing, ensure slope roof engineering quality.
Keywords: high-rise residential; Slope roof; Leakage; Construction technology
近几年来,坡屋面以其造型多变、色彩亮丽和隔热性能优越的特点.在住宅中的使用率越来越高。如何在施工中采取相应措施成为住宅施工的关键课题之一。
1 工程概况
某公馆二期工程为33层框剪结构。采用现浇钢筋混凝土坡屋面.上铺彩色西班牙陶瓦。坡屋面起坡点标高99.50 m,最高坡点为102.50 m,内含阁楼层和机房层,坡屋面四面四向,最陡处1:1,平坦处1:2。屋面结构复杂.平坡相交,坡内含坡。
2 屋面构造
屋面构造为现浇钢筋混凝土屋面板;20厚1:2.5防水水泥砂浆找平层.垂直 平行屋脊每4m设置一道分格缝,缝内改性沥青封胶嵌缝;1.5厚JSA.100防水涂膜;45厚挤塑聚苯板保温层;5O厚C30细石混凝土内配钢筋 4@150双层双向钢筋网片,钢筋网片翻过屋脊500并搭接绑扎牢固,垂直、平行屋脊每4m设置一道分格缝,缝宽20mm 缝内改性沥青嵌缝;l:3:9混合砂浆座浆安装陶瓦。
3 屋面结构施工
3.1 模板工程
首先在屋面天溝平板99.50 m标高处弹线,对起坡点上翻梁的位置进行定位,确保起坡线位置准确.保证整个坡屋面结构位置的正确。
其次是整个坡屋面梁立体定位较困难。在施工中先定出屋脊线上梁两端标高 铺设梁底模,由梁高定出梁两侧侧模顶标高,并以此为控制线定出各坡屋面板的实际走向及坡度。施工前将图纸上混凝土的成型标高换算成各分段模板的标高。换算时应注意各分段混凝土的厚度、坡度及该段模板的搁置顺序.对于特殊部位应放大样。其施工顺序为:支立柱墙摸一支立平梁模一支立斜梁模一铺设坡屋面模板一支阁楼柱墙、梁、板模一待钢筋绑扎完毕后封部分面模。
三是对东西面坡度较大的部位采用双面支模法。从起坡线往上覆两块1 m模板.采用 12螺杆加固,螺杆中设上水片.两边设定位钢筋.以控制屋面板厚度及止水。在两块模板外侧面中部开设混凝土浇注孔,尺寸400 mmX400mm。
四是对南北面坡度较小的部位采用单面支模法。为防止浇筑时混凝土下滑,外侧面每隔1.5 m加一道横向方木。
五是除按照常规搭设架体外。需增设剪刀撑和扫地钢管与承重架连成整体,以防坡屋面混凝土浇筑时产生水平分力作用使屋面变形。
3.2 钢筋工程
钢筋工程施工前要了解节点构造大样、梁的搁置顺序及各种钢筋半成品的形状。钢筋下料长度可按已支设的模板现场量取。钢筋工程施工采用以下一些技术措施。
一是在所有柱与斜屋面相交成斜面柱处,需锚入板或梁内的柱筋顶标高均不相同。因此,顶层柱筋的下料和绑扎应特别注意。
二是钢筋形状变化大.尺寸收放多。为了安装方便需断开钢筋时应注意:板底筋断在梁中或锚入梁内,板面筋断在板跨1/3处;梁底筋断在柱附近或锚入柱内.梁面筋断在1/3梁跨处。要保证满足钢筋接头的允许百分率。
三是在多支梁相交 梁转弯和梁标高突变处,要认真对照大样图.了解钢筋构造,掌握钢筋绑扎顺序,注意保证副筋和主筋位置正确.并保证钢筋的搭接长度和锚固长度。
四是在操作人员经常行走处将梁箍筋与主筋点焊牢固。
3.3 混凝土工程
由于坡屋面起坡处钢筋较密,为了确保混凝土密实 坡屋面混凝土分两次浇筑。先浇墙柱有利于加强整个坡屋面的稳定,减少浇筑屋面的工作量.确保柱、墙混凝土的质量。考虑屋面高度较高 垂直运输距离长.用塔吊运输难以确保浇筑速度,在接缝处易产生冷缝而引起混凝土裂缝,导致屋面渗漏等因素,采用泵送混凝土.由于混凝土塌落度较大.直接从一边浇筑混凝土难以成型,而且易使模板支撑系统失稳,因此应注意掌握混凝土的初凝时间,采用对称浇筑法。伸出斜屋面的阁楼柱、墙待屋面混凝土基本初凝后再浇筑,以免混凝土墙烂根。
双面支模处混凝土浇筑时,用 33插入式振动器(内振)与中50振动器(外振)相配合。待浇至混凝土预留孔时.由木工封死浇筑孔,再从上一排浇筑孔插入振动器。当浇筑过程中不能观察到封闭模板内混凝土的饱满度时.可采用榔头敲击模板听音探查,并在板底加振(附着式振捣器).使混凝土下淌充实。另外可在板上钻一些直径4 mm~6 mm的孔,观察混凝土浆从孔中渗出情况判断是否密实到位。对无法振捣的部位和死角,应采用板外振捣,人工插钎插捣等方式将混凝土振捣密实。加料有困难时.应配备导料斗等,使混凝土按序就位,防止各部位加料不均匀造成孔洞。
单面支模处混凝土用振捣棒稍加振捣后,将滑移下坠的混凝土刮到上部去,待混凝土初凝时再用微型平板振动器振捣并抹平。为了使板面有较好的平整度,随捣随用1:2.5水泥砂浆抹平。
注意屋面混凝土表面平整度的控制。事先每隔2 m 用短钢筋电焊固定在板筋上,上涂红漆作为控制点。浇筑混凝土时拉斜线找平。做好混凝土浇水养护工作。混凝土终凝后覆盖草袋,并且定时浇水养护7d。
4 防水层施工
对基层处理时基体表面应平整、结实、无蜂窝麻面、无尘土和油污现象。满涂JSA防水涂膜时.应对屋面周边、节点、转角处作重点处理.完毕后用针入法确定涂膜厚度是否到达设计要求。
5 刚防层施工
钢筋网片应采用焊接型网片。混凝土浇捣时. 宜先铺2/3厚度混凝土并摊平 再放置钢筋网片,后铺l/3的混凝土,振捣并碾压密实收光。混凝土收水初凝后,及时取出分格缝隔板,用铁抹子第二次压实拌光,并及时修补分格缝的
缺损部位.做到平直整齐,待混凝土终凝前进行第三次压实抹光。要求做到表面平光、不起砂、无抹板压痕为止。分格缝应上下贯通 缝内不得有水泥砂浆等杂物。待分格缝和周边缝隙干净干燥后,用与密封材料相匹配的基层处理剂涂刷。待其表面干燥后.立即嵌填防水油膏。密封材料底层应填背衬泡沫、分格缝上口粘贴不小于200 mm宽的卷材保护层。混凝土养护不小于14 d。
6 屋面西班牙瓦施工
屋面西班牙瓦安装铺设需水平、垂直、对角线三方面标齐.采用卧浆粘贴工序。在现浇屋面找平后放线,先确定屋脊、天沟位置,然后从屋檐往上量370 mm,弹一条平行线以确定屋檐第一排瓦的位置。
为了保证每排瓦间距均匀相等,按以下方法计算铺瓦的层数及间距:设檐口的长度为A,A/345=D(瓦长420 mm一搭接长度75 mm=345 mm),计算结果D极少为整数;为满足上下搭接>75mm.取大于D的一个整数C,再以A/C=B.B即为铺瓦时瓦面之间的间距。
为保证铺瓦后的屋面达到水平、垂直、对角线三方面标齐,应将屋檐第一排瓦和屋脊处最后一排预铺瓦的边筋位置对正,弹纵向直线.使每两片瓦的边筋与线对齐。注意凡需防水处理的节点一定要进行防水处理后再铺瓦.施工过程中
应尽量减少瓦面污染。刚施工完毕的瓦片不能立即踩踏以免影响砂浆粘结。
注:文章内所有公式及图表请用PDF形式查看。
关键词: 高层住宅;坡屋面;防渗漏;施工技术
中图分类号:TU74文献标识码:A文章编号:
Abstract: in recent years high-rise residential use more and more of the slope roof, but because the flat roof and have great differences, actual waterproof effect not satisfactory, leakage is often happened. Combined with the engineering practice, through the template site positioning, determine the mode branch method, know reinforced structure DaYang node, reinforced the take material quantity, determining concrete pouring order, mode, the details of the node processing, ensure slope roof engineering quality.
Keywords: high-rise residential; Slope roof; Leakage; Construction technology
近几年来,坡屋面以其造型多变、色彩亮丽和隔热性能优越的特点.在住宅中的使用率越来越高。如何在施工中采取相应措施成为住宅施工的关键课题之一。
1 工程概况
某公馆二期工程为33层框剪结构。采用现浇钢筋混凝土坡屋面.上铺彩色西班牙陶瓦。坡屋面起坡点标高99.50 m,最高坡点为102.50 m,内含阁楼层和机房层,坡屋面四面四向,最陡处1:1,平坦处1:2。屋面结构复杂.平坡相交,坡内含坡。
2 屋面构造
屋面构造为现浇钢筋混凝土屋面板;20厚1:2.5防水水泥砂浆找平层.垂直 平行屋脊每4m设置一道分格缝,缝内改性沥青封胶嵌缝;1.5厚JSA.100防水涂膜;45厚挤塑聚苯板保温层;5O厚C30细石混凝土内配钢筋 4@150双层双向钢筋网片,钢筋网片翻过屋脊500并搭接绑扎牢固,垂直、平行屋脊每4m设置一道分格缝,缝宽20mm 缝内改性沥青嵌缝;l:3:9混合砂浆座浆安装陶瓦。
3 屋面结构施工
3.1 模板工程
首先在屋面天溝平板99.50 m标高处弹线,对起坡点上翻梁的位置进行定位,确保起坡线位置准确.保证整个坡屋面结构位置的正确。
其次是整个坡屋面梁立体定位较困难。在施工中先定出屋脊线上梁两端标高 铺设梁底模,由梁高定出梁两侧侧模顶标高,并以此为控制线定出各坡屋面板的实际走向及坡度。施工前将图纸上混凝土的成型标高换算成各分段模板的标高。换算时应注意各分段混凝土的厚度、坡度及该段模板的搁置顺序.对于特殊部位应放大样。其施工顺序为:支立柱墙摸一支立平梁模一支立斜梁模一铺设坡屋面模板一支阁楼柱墙、梁、板模一待钢筋绑扎完毕后封部分面模。
三是对东西面坡度较大的部位采用双面支模法。从起坡线往上覆两块1 m模板.采用 12螺杆加固,螺杆中设上水片.两边设定位钢筋.以控制屋面板厚度及止水。在两块模板外侧面中部开设混凝土浇注孔,尺寸400 mmX400mm。
四是对南北面坡度较小的部位采用单面支模法。为防止浇筑时混凝土下滑,外侧面每隔1.5 m加一道横向方木。
五是除按照常规搭设架体外。需增设剪刀撑和扫地钢管与承重架连成整体,以防坡屋面混凝土浇筑时产生水平分力作用使屋面变形。
3.2 钢筋工程
钢筋工程施工前要了解节点构造大样、梁的搁置顺序及各种钢筋半成品的形状。钢筋下料长度可按已支设的模板现场量取。钢筋工程施工采用以下一些技术措施。
一是在所有柱与斜屋面相交成斜面柱处,需锚入板或梁内的柱筋顶标高均不相同。因此,顶层柱筋的下料和绑扎应特别注意。
二是钢筋形状变化大.尺寸收放多。为了安装方便需断开钢筋时应注意:板底筋断在梁中或锚入梁内,板面筋断在板跨1/3处;梁底筋断在柱附近或锚入柱内.梁面筋断在1/3梁跨处。要保证满足钢筋接头的允许百分率。
三是在多支梁相交 梁转弯和梁标高突变处,要认真对照大样图.了解钢筋构造,掌握钢筋绑扎顺序,注意保证副筋和主筋位置正确.并保证钢筋的搭接长度和锚固长度。
四是在操作人员经常行走处将梁箍筋与主筋点焊牢固。
3.3 混凝土工程
由于坡屋面起坡处钢筋较密,为了确保混凝土密实 坡屋面混凝土分两次浇筑。先浇墙柱有利于加强整个坡屋面的稳定,减少浇筑屋面的工作量.确保柱、墙混凝土的质量。考虑屋面高度较高 垂直运输距离长.用塔吊运输难以确保浇筑速度,在接缝处易产生冷缝而引起混凝土裂缝,导致屋面渗漏等因素,采用泵送混凝土.由于混凝土塌落度较大.直接从一边浇筑混凝土难以成型,而且易使模板支撑系统失稳,因此应注意掌握混凝土的初凝时间,采用对称浇筑法。伸出斜屋面的阁楼柱、墙待屋面混凝土基本初凝后再浇筑,以免混凝土墙烂根。
双面支模处混凝土浇筑时,用 33插入式振动器(内振)与中50振动器(外振)相配合。待浇至混凝土预留孔时.由木工封死浇筑孔,再从上一排浇筑孔插入振动器。当浇筑过程中不能观察到封闭模板内混凝土的饱满度时.可采用榔头敲击模板听音探查,并在板底加振(附着式振捣器).使混凝土下淌充实。另外可在板上钻一些直径4 mm~6 mm的孔,观察混凝土浆从孔中渗出情况判断是否密实到位。对无法振捣的部位和死角,应采用板外振捣,人工插钎插捣等方式将混凝土振捣密实。加料有困难时.应配备导料斗等,使混凝土按序就位,防止各部位加料不均匀造成孔洞。
单面支模处混凝土用振捣棒稍加振捣后,将滑移下坠的混凝土刮到上部去,待混凝土初凝时再用微型平板振动器振捣并抹平。为了使板面有较好的平整度,随捣随用1:2.5水泥砂浆抹平。
注意屋面混凝土表面平整度的控制。事先每隔2 m 用短钢筋电焊固定在板筋上,上涂红漆作为控制点。浇筑混凝土时拉斜线找平。做好混凝土浇水养护工作。混凝土终凝后覆盖草袋,并且定时浇水养护7d。
4 防水层施工
对基层处理时基体表面应平整、结实、无蜂窝麻面、无尘土和油污现象。满涂JSA防水涂膜时.应对屋面周边、节点、转角处作重点处理.完毕后用针入法确定涂膜厚度是否到达设计要求。
5 刚防层施工
钢筋网片应采用焊接型网片。混凝土浇捣时. 宜先铺2/3厚度混凝土并摊平 再放置钢筋网片,后铺l/3的混凝土,振捣并碾压密实收光。混凝土收水初凝后,及时取出分格缝隔板,用铁抹子第二次压实拌光,并及时修补分格缝的
缺损部位.做到平直整齐,待混凝土终凝前进行第三次压实抹光。要求做到表面平光、不起砂、无抹板压痕为止。分格缝应上下贯通 缝内不得有水泥砂浆等杂物。待分格缝和周边缝隙干净干燥后,用与密封材料相匹配的基层处理剂涂刷。待其表面干燥后.立即嵌填防水油膏。密封材料底层应填背衬泡沫、分格缝上口粘贴不小于200 mm宽的卷材保护层。混凝土养护不小于14 d。
6 屋面西班牙瓦施工
屋面西班牙瓦安装铺设需水平、垂直、对角线三方面标齐.采用卧浆粘贴工序。在现浇屋面找平后放线,先确定屋脊、天沟位置,然后从屋檐往上量370 mm,弹一条平行线以确定屋檐第一排瓦的位置。
为了保证每排瓦间距均匀相等,按以下方法计算铺瓦的层数及间距:设檐口的长度为A,A/345=D(瓦长420 mm一搭接长度75 mm=345 mm),计算结果D极少为整数;为满足上下搭接>75mm.取大于D的一个整数C,再以A/C=B.B即为铺瓦时瓦面之间的间距。
为保证铺瓦后的屋面达到水平、垂直、对角线三方面标齐,应将屋檐第一排瓦和屋脊处最后一排预铺瓦的边筋位置对正,弹纵向直线.使每两片瓦的边筋与线对齐。注意凡需防水处理的节点一定要进行防水处理后再铺瓦.施工过程中
应尽量减少瓦面污染。刚施工完毕的瓦片不能立即踩踏以免影响砂浆粘结。
注:文章内所有公式及图表请用PDF形式查看。