论文部分内容阅读
建滔广场上海二期钢结构工程,为空间桁架结构,4榀箱形桁架为主要受力体系,跨度与提升高度较大。施工采用地面拼装、计算机控制整体同步提升的施工技术。通过仿真模拟对整个拼装施工过程进行分析,验证了地面拼装的可行性。同时在计算机控制整体同步提升过程中对结构各个阶段的变形和应力进行了实时检测,为结构的安全施工提供了保障。
Kingboard Plaza Shanghai Phase II steel structure project is a space truss structure with 4 榀 box-shaped truss as the main force system, with great span and lifting height. Construction using ground assembly, computer control of the overall synchronization of construction technology. Through the simulation analysis of the entire assembly construction process analysis to verify the feasibility of the ground assembly. At the same time, the deformation and stress of the various stages of the structure were detected in real time during the whole process of computer control, which provided a guarantee for the safe construction of the structure.