介绍了一种多断面方坯连铸机二冷喷淋系统设计优化策略。通过对二冷喷淋系统的相关设备进行设计优化后,连铸机的更换铸坯断面时间降低到约10 h,生产准备时间降低到约0.5 h;同时,有效地解决了铸坯质量差、设备检修困难及漏钢等问题。为同类型的连铸机二冷喷淋系统改造或设计提供了实践经验。
The design optimization strategy of a second cold spray system for multi-section billet continuous casting machine is introduced. After the design and optimization of the related equipment of the second cold spray system, the cross-section change time of the continuous casting machine is reduced to about 10 h and the production preparation time is reduced to about 0.5 h. Meanwhile, the slab quality is effectively solved, Equipment maintenance difficulties and breakout and other issues. For the same type of continuous casting machine two cold spray system transformation or design provides practical experience.